406. End plates, crown plates and tube plates.─ (1) End plate of welded Lancashire and Cornish boilers shall be flanged for attachment to shell plates.
(2)For requirements of end plates of boilers, sub-regulation (1) of regulation 86 shall apply.
(3)For requirements of hemispherical crowns, regulation 89 shall apply.
(4)For requirements of flanging, sub-regulation (2) of regulation 86 shall apply.
(5)In the construction of unfired boilers when the dished ends do not form a part of the heating surface, cold spun dished ends conforming to IS: 2825 may be used.
(6)Where flats are pressed in dished end plates, for the attachment of mountings they shall be formed with an ample radius at the junction of the flat and curved surfaces, and shall be free from sharp corners or tool marks. The plate shall not be unduly thinned.
(7)(a) Plates which are flanged in accordance with sub-regulation (4), shall be welded to the parts to which they are to be connected as follows:
(i)to shells or cylindrical fireboxes as shown in Figures 12/7, 12/8, 12/9, 12/10 or 12/11.
(ii)to internal flue tubes as shown in Figures 12/14, 12/15 or 12/16.
(iii)to uptake as shown in Figure 12/16.
(iv)to combustion chamber or firebox wrapper plates as shown in Figure 12/19.
(b)Plates which are not flanged shall be welded to the parts to which they are to be connected as follows:
(i)to shells as shown in Figure 12/12 or 12/13.
(ii)to internal flue tubes or uptakes as shown in Figure 12/17.
(iii)to combustion chamber or firebox wrapper plates as shown in Figures 12/20, 12/21 or 12/22.
(c)Where dished ends or crowns are used, they shall be flanged for connection to the shell or the cylindrical portion of the firebox. Flat shell and firebox crown plates of vertical boilers shall also be flanged for connection to the cylindrical portions of the shell or firebox.
(d)The opening in the firebox crown plate of a vertical boiler for the uptake shall be flanged and the connection to the uptake made by means of a circumferential butt-weld. (see Figures 12/3, 12/4, 12/5, 12/6).
Figures cited in this regulation (19, exact crops of the Gazette)

View Gazette page 798 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 798 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 798 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 798 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 799 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 799 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 799 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 799 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 799 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 799 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 800 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 800 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 800 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 800 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 801 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 801 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 801 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 801 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 801 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
In short
Regulation 406 covers end plates, crown plates and tube plates of welded boilers, and how they are welded to the parts they join.
Key points
- (1) End plates of welded Lancashire and Cornish boilers must be flanged for attachment to the shell plates.
- (2) End plates follow sub-regulation (1) of regulation 86; (4) flanging follows sub-regulation (2) of that regulation.
- (3) Hemispherical crowns follow regulation 89.
- (5) In unfired boilers, where dished ends are not part of the heating surface, cold spun dished ends conforming to IS: 2825 may be used.
- (6) Flats pressed in dished ends for mountings need an ample radius where flat meets curve, no sharp corners or tool marks, and no undue thinning.
- (7)(a) Flanged plates are welded to shells, fireboxes, flue tubes, uptakes or combustion chamber and firebox wrapper plates as shown in the listed figures.
- (7)(b) Unflanged plates are welded to shells, flue tubes, uptakes or wrapper plates as shown in the listed figures.
- (7)(c) Dished ends or crowns are flanged for connection to the shell or cylindrical firebox. Flat shell and firebox crown plates of vertical boilers are also flanged.
- (7)(d) The uptake opening in a vertical boiler's firebox crown plate is flanged and joined to the uptake by a circumferential butt-weld.
Watch out
- Each joint type has its own permitted figures. Check the Official text tab and the Gazette figures for the one that applies.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 33 | Plates | 100% | Chapter II (DPIIT scan), image 3 |
| 118 | Tube Plates | 100% | Chapter III (DPIIT scan), image 2 |
| 634 | Tube plates | 100% | Chapter XV (DPIIT scan), image 3 |
IBR 1950 regulation 33 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 33 page for its amendments.
| Reg. 33 MATERIALS OF CONSTRUCTION COPPER PLATES, STAY AND RIVET BARS |
| (a) Process.- The copper shall be fire-refined or electrolytic and hot-rolled from suitable cakes. (b) Chemical Composition.- The chemical composition of the plates shall be as follows:-
(c) Freedom from defects.- The plates shall be clean, smooth and free from defects and shall have a workmanlike finish. They shall be thoroughly annealed. (d) Rolling Margin.- No plate shall be under the specified thickness at any part, not more than 5% over the calculated weight. The scrap margin, partly sheared and left attached, shall be not less than 3 inches at the ends and 1½ inches at each side. (e) Tensile Tests.- One tensile test shall be taken from each plate as rolled. The tensile breaking strength, from Standard Test Piece A, shall not be less than 14 tons per sq. inch with an elongation of not less than 35%. (f) Hot and Cold Bend tests.- One hot (temperature between 1200°F and 1400°F) and one cold bend test shall be taken from each plate as rolled. For either hot or cold bend tests, the test piece shall withstand being doubled over without fracture until the sides are touching and parallel. |
IBR 1950 regulation 118 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 118 page for its amendments.
| Reg. 118, Reg. 119, Reg. 120 END PLATES
Tube Plates Parts of flat tube plates within the tube nests
Reg. 120 END PLATES Flanging of End Plates All flanges shall be a good fit to the shell and flues. Flogging and/or hammering in the fitting of these parts is prohibited. The caulking edges of all flanged plates shall be machined or machine gas cut. |
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 406, Regulation 406, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.757–758. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.