Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction
Regulation 432. Methods of welding
Not yet checked against the official Gazette; verify before relying on it.
432. Methods of welding.─ (1) The seams shall be fusion welded from both sides of the plates. The main welding may be on either side of the plate, whichever it is most convenient to the manufacturer. Before the second side of the plate is welded, the weld metal at the bottom of the first side shall be removed by grinding, chipping, machining or other approved method.
(2)Provided the requisite quality of welding is achieved, the seams may be welded from both sides of the plate or from one side of the plate. Before the second side of the plate is welded, the metal at the bottom of the first side shall be removed by grinding, chipping, machining or other approved method.
(3)Additional runs of metal shall be deposited at both surfaces of the welded seams to ensure that the weld metal at the level of the surfaces of the plate is refined as far as possible.
(4)Thickness of such additional welding shall not exceed values given in following table.
TABLE 12/3: Thickness of additional welding
| Serial number | Nominal thickness in mm | Maximum reinforcement in mm | |
|---|---|---|---|
| Circumferential joint in Pipe and tubing | Other Welds | ||
| (1) | (2) | (3) | (4) |
| 1 | Upto 3 | 2.5 | 2.5 |
| 2 | Over 3 to 5 incl. | 3.0 | 2.5 |
| 3 | Over 5 to 13 incl. | 4.0 | 2.5 |
| 4 | Over 13 to 25 incl. | 5.0 | 2.5 |
| 5 | Over 25 to 50 incl. | 6.0 | 3.0 |
| 6 | Over 50 to 75 incl. | Note | 4.0 |
| 7 | Over 75 to 100 incl. | Note | 5.5 |
| 8 | Over 100 to 125 incl. | Note | 6.0 |
| 9 | Over 125 | Note | 8.0 |
Table structure read from the Gazette PDF, page 765. Verification status as for the text above.
Show original extracted text (diagnostic, not authoritative)
Serial Maximum reinforcement in mm
number Nominal thickness in mm Circumferential joint in Pipe and Other Welds
tubing
(1) (2) (3) (4)
1 Upto 3 2.5 2.5
2 Over 3 to 5 incl. 3.0 2.5
3 Over 5 to 13 incl. 4.0 2.5
4 Over 13 to 25 incl. 5.0 2.5
5 Over 25 to 50 incl. 6.0 3.0
6 Over 50 to 75 incl. Note 4.0
7 Over 75 to 100 incl. Note 5.5
8 Over 100 to 125 incl. Note 6.0
9 Over 125 Note 8.0Note – The greater of 6 mm or 1/8 times width of weld in mm
(5)The surfaces of the welds which are to be subsequently radiographed shall be sufficiently free from coarse ripples, overlap, grooves, abrupt ridges and valleys, so as to avoid stress raisers and to permit proper interpretation of radiographs and other Non-Destructive Test (NDT) methods. If there is a question regarding the surface condition of the weld when interpreting a radiographic film, the film shall be compared to the actual weld surface or provide smooth contours and to be flush with the respective surfaces of the plate before radiography examination is done.
(6)In the case of circumferential shell seams welded by submerged arc or any other approved automatic process producing a similar surface finish, such circumferential welds, need not be flush dressed, subject to their surface finish and shape being acceptable to the Inspecting Authority.
(7)Undercut shall not exceed 0.8mm or 10% of wall thickness, whichever is less and undercut shall not encroach on design wall thickness.
(8)The positions of the welds shall be marked, compensation plates, doubling plates or manhole frames, not less than two runs or metal shall be deposited at each weld.
(9)When affixing standpipes, branch pipes, seatings, compensation plates, doubling plates or manhole frames, not less than two runs or metal shall be deposited at each weld.
(10)Each run of weld metal shall be thoroughly cleaned and freed from slag before the next run is deposited.
Parts of this extracted text look garbled; read the Gazette page before using any value.
Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
In short
Sets how shell seams are welded, the limits on weld reinforcement and undercut, and the surface condition needed for radiography.
Key points
- (1) Seams are fusion welded from both sides; the main weld may be on whichever side suits the manufacturer. Before welding the second side, the weld metal at the bottom of the first side must be removed by grinding, chipping, machining or another approved method.
- (2) If the required weld quality is achieved, seams may be welded from both sides or from one side, with the same removal rule before the second side.
- (3) Additional runs are deposited on both surfaces so the weld metal at plate-surface level is refined as far as possible.
- (4) Table 12/3 limits the thickness of this additional welding (maximum reinforcement) by nominal thickness, with separate columns for circumferential joints in pipe and tubing and for other welds. See the Official text tab for values.
- (5) Weld surfaces to be radiographed must be free enough from coarse ripples, overlap, grooves, ridges and valleys to avoid stress raisers and allow proper interpretation of radiographs and other NDT.
- (6) Circumferential shell seams made by submerged arc or a similar approved automatic process need not be flush dressed, if the Inspecting Authority accepts their finish and shape.
- (7) Undercut must not exceed 0.8 mm or 10% of wall thickness, whichever is less, and must not encroach on design wall thickness.
- (9) When affixing standpipes, branch pipes, seatings, compensation plates, doubling plates or manhole frames, at least two runs of metal must be deposited at each weld.
- (10) Each run must be cleaned and freed from slag before the next is deposited.
Watch out
- Sub-regulation (8) reads as garbled in the extracted text; check the Gazette page for its exact wording.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 8 | Welding | 100% | Chapter I (DPIIT scan), image 3 |
Amendment history of the candidate IBR 1950 regulation: Reg. 8 (2 amendments)
IBR 1950 regulation 8 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 8 page for its amendments.
| Reg. 8 Welding:- |
| (a) The use of welding in the construction of boilers shall be permitted only where specifically provided for in the standard conditions. |
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 432, Regulation 432, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.764–765. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.