Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction
Regulation 426. Attachment of standpipes
Not yet checked against the official Gazette; verify before relying on it.
426.Attachment of standpipes.─(1)The following constructions as to standpipes attached to shells and end plates shall be permissible:-
(i)When the internal diameter of the standpipe does not exceed 25 mm the standpipe may be screwed into the plate with a nut on the waterside.
(ii)Where the internal diameter of the standpipe exceeds 25 mm but does not exceed 50 mm, it may be screwed in and seal welded.
(iii)Where the diameter of the standpipe exceeds 50 mm, it may be welded to the end plate.
(2)The provisions in sub-regulation (1) as to the standpipe attachment shall be regulated by the following conditions-
(i)When standpipes are screwed, the screwing shall be of standard pipe thread.
(ii)Standpipes shall be attached by one of the methods shown in Figures 12/104, 12/105,12/106,12/107,
12/108, 12/109, 12/110, 12/111, 12/112, 12/113 and 12/118 or by any other method approved by the Inspecting Authority.
(iii)Where the standpipes are fabricated by fusion-welding, they shall be stress relieved by heat-treatment before attachment to the boiler, unless the whole boiler is subject to heat-treatment on completion.
(iv)Where the bore of the standpipe does not exceed 127 mm or the diameter of the opening in the shell does not exceed 127 mm plus twice the thickness of the plate to which it is attached, the standpipe may be welded to the plate without subsequent heat-treatment of the welds made. If these limits are exceeded, the whole plate to which the standpipe is attached shall be stress relieved by heat-treatment on completion of welding.
Figures cited in this regulation (9, exact crops of the Gazette)

View Gazette page 828 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 828 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 829 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 830 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 831 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 831 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 832 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 831 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 832 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
In short
Lists the permitted ways of attaching standpipes to shells and end plates, based on standpipe diameter, and the conditions that go with them.
Key points
- (1)(i) Internal diameter not more than 25 mm: may be screwed into the plate with a nut on the waterside.
- (1)(ii) Internal diameter over 25 mm but not over 50 mm: may be screwed in and seal welded.
- (1)(iii) Diameter over 50 mm: may be welded to the end plate.
- (2)(i) Screwed standpipes must use standard pipe thread.
- (2)(ii) Attachment must follow one of the methods in Figures 12/104 to 12/113 or Figure 12/118, or another method approved by the Inspecting Authority.
- (2)(iii) Standpipes fabricated by fusion welding must be stress relieved by heat treatment before attachment, unless the whole boiler is heat treated on completion.
- (2)(iv) If the standpipe bore is not more than 127 mm, or the shell opening is not more than 127 mm plus twice the plate thickness, it may be welded on without heat treatment of those welds.
Watch out
- If the limits in (2)(iv) are exceeded, the whole plate carrying the standpipe must be stress relieved by heat treatment after welding, not just the local weld.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 600 | Pads Welded to shell or the attachment of Flanged Mountings | 70% | Chapter XII (DPIIT scan), image 15 |
IBR 1950 regulation 600 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 600 page for its amendments.
| Reg. 598, Reg. 599, Reg. 600, Reg. 601 | ||||||||||||||||||||||||||||||||||||||||||||||
Reg. 599 Cross Tubes
Reg. 600 Pads Welded to shell or the attachment of Flanged Mountings
Reg. 601
| ||||||||||||||||||||||||||||||||||||||||||||||
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 426, Regulation 426, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.763–764. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.