397. Equipment of workshop. ─ (1) The welding plant and equipment shall be of good quality and maintained in an efficient working condition. The welding apparatus shall be installed under cover and arranged so that welding work may be carried out in positions free from draughts and adverse weather conditions. The procedure shall be such that there is regular and systematic supervision of the welding works, and the welding operators shall be subjected to periodic tests for quality of workmanship by the works officials. Records of these tests shall be kept and shall be made available to the Competent Person for scrutiny.

(2)The works shall be equipped with welding plant equipment and quality control personnel. However, the equipment for destructive, non-destructive testing and heat treatment are not necessary. The manufacturer can tie-up for these facilities outside and a letter from the party with whom he makes a tie-up shall be made available to the Chief Inspector of Boilers or the Inspecting Authority or his representative and shall be allowed to inspect the material of the party in the laboratory during the test.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 397 sets the minimum workshop set-up for a maker of fusion welded boilers.

Key points

  • (1) Welding plant and equipment must be of good quality and kept in efficient working order.
  • (1) Welding apparatus must be under cover, so welding is done free from draughts and adverse weather.
  • (1) Welding work needs regular, systematic supervision. Welding operators are tested periodically by the works officials for quality of workmanship, and the records are kept for the Competent Person to scrutinise.
  • (2) The works must have welding plant equipment and quality control personnel.

Watch out

  • (2) In-house equipment for destructive testing, non-destructive testing and heat treatment is not necessary. The maker may tie up with an outside party. A letter from that party must be made available to the Chief Inspector of Boilers or the Inspecting Authority, who must be allowed to inspect the material in that party's laboratory during the test.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
756
PDF page index
756 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash a049d2d539ee07fa
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 397, Regulation 397, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.756. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.