Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction

Regulation 441. Additional tests before rejection

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 768

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

441.Additional tests before rejection.─(1)In case any of the test specimens taken in accordance with regulations 435 to 443fail to meet the specified requirements, retests shall be allowed for each specimen that fails as follows:

(2)Where any result of the tensile test is not less than 90% of the specified figures, one retest shall be made. Where any result falls below 90%, two retests shall be made.

(3)Where a bend specimen fails to meet the specified requirements, two retests shall be made.

(4)If an impact test fails to meet the specified requirements, two retests shall be taken from the test plate, one on each side of the final specimen and separate from it by not more than 5 mm.

(5)If it be found there is insufficient metal to permit the preparation of specimens for retests from the remainder of the test plate from which the original specimen was taken, the specimen for retest may be cut from the test plate relating to the opposite end of the same longitudinal seam.

(6)In case any of the additional tests fail to meet the specified requirements, the welded seams represented by these tests shall be rejected.

Referenced provisions

Reg. 435 · Reg. 443

Independent explanation — not the law · draft · engineer review in progress

In short

Allows retests when specimens taken under regulations 435 to 443 fail, and sets how many.

Key points

  • (2) Tensile test: if the result is at least 90% of the specified figure, one retest; if below 90%, two retests.
  • (3) Bend test failure: two retests.
  • (4) Impact test failure: two retests from the test plate, one on each side of the failed specimen and no more than 5 mm from it.
  • (5) If the original test plate has too little metal left, retest specimens may be cut from the test plate at the opposite end of the same longitudinal seam.

Watch out

  • (6) If any additional test fails, the welded seams represented by those tests are rejected.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
55Additional tests before rejection100%Chapter II (DPIIT scan), image 10
66Additional Tests100%Chapter II (DPIIT scan), image 13

Amendment history of the candidate IBR 1950 regulations: Reg. 55 (1 amendment)

IBR 1950 regulation 55 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 55 page for its amendments.

Reg. 55
MATERIALS OF CONSTRUCTION

SEAMLESS FERRITIC PIPES FOR HIGH TEMPERATURE SERVICE

Additional tests before rejection

(i)If any one or more tests specified in these regulations fail, two further tests of the same kind may be made on two other pipes of the same batch.  If any of these tests fails, the batch of the pipes represented may be given a further heat treatment and entire set of tests shall be repeated. 

(ii)  If the repeat tests are satisfactory, the pipes shall be accepted. If any failure in the tests should occur the entire batch of the pipes shall be rejected.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
768
PDF page index
768 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 52392c5cd96b9459
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 441, Regulation 441, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.768. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.