Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction

Regulation 440. Macro and micro examinations

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 768

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

440.Macro and micro examinations.─(1) A specimen of the full thickness of the plate and not less than 13 mm wide shall be provided from each set of test plates for the purpose of macro and micro examinations.

(2)Micro-etching of a complete cross-section of the weld including the heat affected zone shall show satisfactory penetration, fusion and absence of significant inclusions or other defects. In case there is any doubt as to the condition of the weld as shown by macro-etching, the area concerned is to be microscopically examined for defect investigation.

Independent explanation — not the law · draft · engineer review in progress

In short

Requires a macro and micro examination specimen from each set of test plates and states what it must show.

Key points

  • (1) The specimen is the full plate thickness and at least 13 mm wide.
  • (2) Etching a complete cross-section of the weld, including the heat affected zone, must show satisfactory penetration and fusion, with no significant inclusions or other defects.
  • (2) If macro-etching leaves doubt about the weld, the area is examined microscopically to investigate defects.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
768
PDF page index
768 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 85d0b7785339d691
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 440, Regulation 440, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.768. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.