BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction

Regulation 491. Tolerances and allowances

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 793

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

491. Tolerances and allowances.─ The calculated wall thickness contains a fixed allowance of 0.75 mm for corrosion and wear. For corrugated furnaces, the calculated wall thickness shall be the minimum thickness of the finished furnace. For plain furnaces and reversal chambers, allowance shall be made to take account of any minus tolerances on the plate thickness.

Independent explanation — not the law · draft · engineer review in progress

In short

The calculated furnace wall thickness already includes a fixed 0.75 mm allowance for corrosion and wear.

Key points

  • Corrugated furnaces: the calculated thickness is the minimum thickness of the finished furnace.
  • Plain furnaces and reversal chambers: allowance must also be made for any minus tolerance on the plate thickness.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
793
PDF page index
793 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash e1a3c36d4d8ca770
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 491, Regulation 491, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.793. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.