Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction

Regulation 454. Classification of fusion-welded boilers

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 771–772Table

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

454. Classification of fusion-welded boilers.─ The boilers covered by this chapter shall be classified in accordance with Table 12/4.

Serial Classification TABLE 12/4: Classification of fusion-welded boilers Minimum thickness

Serial numberClassificationLimits of applicationMinimum thickness
(1)(2)(3)(4)
1Class INo limit8 mm
2Class IIWhen the following limits are not exceeded:
(a) Maximum Allowable Working pressure 7
kg/cm2.
(b) Maximum Allowable Working pressure in
kg/cm2 multiplied by internal diameter in cm –
940
Boilers upto and including 915
mm internal diameter 8 mm.
3Class IIIWhen the following Limits are not exceeded:
(a) Maximum Allowable Working pressure 2
kg/cm2.
(b) Maximum Allowable Working pressure in
kg/cm2 multiplied by internal diameter in cm –
535
Boiler over 915 mm internal
diameter 10 mm.

Table structure read from the Gazette PDF, page 771. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
number                       Limits of application
                    (2)
  (1)   Class I                                     (3)                                    (4)
    1   Class II         No limit                                        8 mm
    2                    When the following limits are not exceeded:
                         (a) Maximum Allowable Working pressure 7        Boilers upto and including 915
3 Class III              kg/cm2.                                         mm internal diameter 8 mm.
                         (b) Maximum Allowable Working pressure in
                         kg/cm2 multiplied by internal diameter in cm –  Boiler over 915 mm internal
                         940                                             diameter 10 mm.
                         When the following Limits are not exceeded:
                         (a) Maximum Allowable Working pressure 2
                         kg/cm2.
                         (b) Maximum Allowable Working pressure in
                         kg/cm2 multiplied by internal diameter in cm –
                         535

Parts of this extracted text look garbled; read the Gazette page before using any value.

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Independent explanation — not the law · draft · engineer review in progress

In short

Classifies fusion-welded boilers under this chapter into Class I, Class II and Class III using Table 12/4, which gives limits of application and minimum thickness.

Key points

  • Class I: no limit of application; minimum thickness 8 mm.
  • Class II: applies when the maximum allowable working pressure does not exceed 7 kg/cm2 and the pressure (kg/cm2) multiplied by internal diameter (cm) does not exceed 940.
  • Class III: applies when the maximum allowable working pressure does not exceed 2 kg/cm2 and pressure multiplied by internal diameter (cm) does not exceed 535.
  • The minimum thickness column also gives 8 mm for boilers up to and including 915 mm internal diameter and 10 mm for boilers over 915 mm internal diameter.

Watch out

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
771–772
PDF page index
771–772 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash d4315877336fdbcd
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 454, Regulation 454, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.771–772. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.