BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction

Regulation 476. Girder sling stays

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 784

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

476. Girder sling stays.─ For slung girders, the proportion in slings, links, pins and connections to the shell shall be sufficient to carry the whole load that would otherwise be carried on the toes of the girders and for any of the above parts in tension a stress of 633 kg/cm2 of net section, and for parts in shear a stress of 562 kg/cm2 of net section shall not be exceeded. In the case of parts in double shear, the net area of the section should be taken as 1.875 times the single section.

Independent explanation — not the law · draft · engineer review in progress

In short

For slung girders, the slings, links, pins and connections to the shell must carry the whole load that would otherwise rest on the girder toes.

Key points

  • Parts in tension: stress on net section must not exceed 633 kg/cm2.
  • Parts in shear: stress on net section must not exceed 562 kg/cm2.
  • Parts in double shear: take the net area as 1.875 times the single section.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
784
PDF page index
784 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash cc62f38fc45cc6dd
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 476, Regulation 476, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.784. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.