BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction

Regulation 424. Saddles

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 763

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

424. Saddles.─ Where saddles are used, the edges of the flanges shall be machined or flame-cut by machine. The joining surfaces shall be machined. The studs for the attachment of the mountings, if screwed through the saddle, shall be fitted on the inside with nuts of full thickness. Where the stud holes do not penetrate through the saddles the length of the screwed portion of the stud in the plate shall be not less than the diameter of the stud.

Independent explanation — not the law · draft · engineer review in progress

In short

Sets the workmanship and stud-fixing rules for saddles used to carry mountings.

Key points

  • The edges of the saddle flanges must be machined or flame-cut by machine.
  • The joining surfaces must be machined.
  • If the mounting studs are screwed through the saddle, they must be fitted on the inside with nuts of full thickness.
  • If the stud holes do not go right through the saddle, the screwed length of the stud in the plate must be at least equal to the stud diameter.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
763
PDF page index
763 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 1ad38bab3e061aa5
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 424, Regulation 424, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.763. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.