Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction
Regulation 431. Definition of the term ‘fusion weld’
Not yet checked against the official Gazette; verify before relying on it.
431. Definition of the term ‘fusion weld’.─ (1) For the purpose of this chapter, the term ‘fusion weld’ is applicable to all welded seams made by the metal arc process with covered electrodes or by any other electric arc process in which the arc stream and the deposited weld metal are shielded from atmospheric contamination.
(2)The relevant provisions of this chapter shall also apply to the single run or heavy run welding process and that welded boilers manufactured by that process shall comply with all regulations of this chapter excepting those in which divergence is necessary solely because of special requirements essential for the most efficient utilisation of that process. Thus all regulation governing quality of material construction workmanship, and testing (both non-destructive and otherwise) are applicable.
(3)Where welded shells conforming to the regulations of this chapter are made by single or heavy run process, it shall be understood that regulations 431,432 and 433 do not apply in their entirety. The method of making the welds shall be approved by the Inspecting Authority.
In short
Defines "fusion weld" for this chapter and explains how the chapter applies to boilers made by the single run or heavy run welding process.
Key points
- (1) A fusion weld is any welded seam made by the metal arc process with covered electrodes, or by any other electric arc process where the arc stream and deposited weld metal are shielded from atmospheric contamination.
- (2) Boilers made by the single run or heavy run process must comply with all regulations of this chapter, except where a difference is needed solely because of the special requirements of that process. All rules on material quality, construction, workmanship and testing (non-destructive and otherwise) still apply.
- (3) For welded shells made by the single or heavy run process, regulations 431, 432 and 433 do not apply in their entirety. The welding method must be approved by the Inspecting Authority.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 431, Regulation 431, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.764. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.