444. Test for class II boilers.─ (1) Test pieces shall be selected from each longitudinal seam for the following tests and stamped by the Competent Person for identification.

(i)From the test plate or plates:

(ii)One tensile test specimen for welded seam.

(iii)One bend test specimen.

(iv)One reverse bend test specimen.

(v)One nick-break test specimen.

(2)The disposition of the specimen shall be in accordance with the sketches in Figure 12/79. The remainder of each test plate shall be retained for retests, if required.

Figures cited in this regulation (1, exact crops of the Gazette)

Gazette Fig. 12/79: Details of Test Plates
Fig. 12/79Details of Test Plates
View Gazette page 818 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
Independent explanation — not the law · draft · engineer review in progress

In short

Lists the test specimens required from each longitudinal seam for Class II boilers.

Key points

  • (1) From the test plate(s), stamped by the Competent Person:
  • one tensile specimen for the welded seam;
  • one bend specimen;
  • one reverse bend specimen;
  • one nick-break specimen.
  • (2) Specimen positions follow Figure 12/79. The remainder of each test plate is kept for retests if needed.

The tests are described in regulation 445, regulation 446 and regulation 447; retests in regulation 448.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
770
PDF page index
770 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 5a0def97318061fd
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 444, Regulation 444, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.770. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.