Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction

Regulation 470. Manhole openings in flat plates

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 780Formula / symbols

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

470. Manhole openings in flat plates.─ (1) Where manholes are located in flat plates, the openings shall be suitably compensated.

(2)Compensation shall be obtained by flanging the edge of the opening, or by providing a fabricating ring (see Figures 12/65, 12/66, 12/67, 12/68 and 12/69).

(3)The manhole in the lower portion of the flat front end plates shall be fitted with a flanged strengthening ring, the thickness of the flat portion of which shall be not less than (1.5 T + 3 mm), where, T = the thickness of the end plate in mm, and in boilers of 2280 mm and over, the manhole frame shall be fitted with a peak to reinforce the portion of the end plate between and below the furnaces and this peak shall be securely welded thereto.

(4)In all cases the depth of the flanging or ring shall not be less than that determined by Equation12/6.

Note: Where the manhole is located in or between tube nests in Multi-tubular boilers or below the furnaces of other Boilers, the stay tubes in the boundary rows, or the gusset stays, as applicable, shall be arranged as closely as practicable to the manhole.

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Figures cited in this regulation (5, exact crops of the Gazette)

Gazette Fig. 12/65: Fusion Welded Oval Manhole Frame
Fig. 12/65Fusion Welded Oval Manhole Frame
View Gazette page 813 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
Gazette Fig. 12/66
Fig. 12/66(no caption printed with this figure)
View Gazette page 813 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
Gazette Fig. 12/67
Fig. 12/67(no caption printed with this figure)
View Gazette page 814 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
Gazette Fig. 12/68: Welding Detail For Manhole in Flat End Plate
Fig. 12/68Welding Detail For Manhole in Flat End Plate
View Gazette page 814 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
Gazette Fig. 12/69
Fig. 12/69(no caption printed with this figure)
View Gazette page 815 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
Independent explanation — not the law · draft · engineer review in progress

In short

Requires compensation for manholes in flat plates and sets the strengthening ring and flange rules.

Key points

  • (1)–(2) Manhole openings in flat plates must be suitably compensated, by flanging the edge or by a fabricated ring (Figures 12/65 to 12/69).
  • (3) A manhole in the lower part of flat front end plates must have a flanged strengthening ring whose flat portion is at least (1.5 T + 3 mm) thick, T being the end plate thickness in mm.
  • (3) In boilers of 2280 mm and over, the manhole frame must have a peak, securely welded, to reinforce the end plate between and below the furnaces.
  • (4) The depth of flanging or ring must in all cases be at least that from Equation 12/6 (see regulation 457).

Watch out

  • Where the manhole is in or between tube nests of multi-tubular boilers, or below the furnaces of other boilers, the boundary-row stay tubes or gusset stays must be placed as close to the manhole as practicable.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
33Plates100%Chapter II (DPIIT scan), image 3
113Flat End Plates85%Chapter III (DPIIT scan), image 2
297Openings in Shell79%Chapter VI (DPIIT scan), image 4

Amendment history of the candidate IBR 1950 regulations: Reg. 113 (1 amendment)

IBR 1950 regulation 33 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 33 page for its amendments.

Reg. 33
MATERIALS OF CONSTRUCTION

COPPER PLATES, STAY AND RIVET BARS

Plates

(a) Process.- The copper shall be fire-refined or electrolytic and hot-rolled from suitable cakes.

(b) Chemical Composition.- The chemical composition of the plates shall be as follows:-

Per cent.
Copper 99.2 minimum
Arsenic .30 to .50
Antimony 0.05 maximum
Bismuth 0.05 maximum
Oxygen 0.10 maximum

(c) Freedom from defects.- The plates shall be clean, smooth and free from defects and shall have a workmanlike finish. They shall be thoroughly annealed.

(d) Rolling Margin.- No plate shall be under the specified thickness at any part, not more than 5% over the calculated weight. The scrap margin, partly sheared and left attached, shall be not less than 3 inches at the ends and 1½ inches at each side.

(e) Tensile Tests.- One tensile test shall be taken from each plate as rolled.

The tensile breaking strength, from Standard Test Piece A, shall not be less than 14 tons per sq. inch with an elongation of not less than 35%.

(f) Hot and Cold Bend tests.- One hot (temperature between 1200°F and 1400°F) and one cold bend test shall be taken from each plate as rolled.

For either hot or cold bend tests, the test piece shall withstand being doubled over without fracture until the sides are touching and parallel.

IBR 1950 regulation 113 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 113 page for its amendments.

Reg. 113
END PLATES
Flat End Plates

a) The plates of boilers shall preferably be in one piece made from one rolled plate. Alternatively, the end plates may be built up from two pieces by riveting or by fusion butt-welding. In the latter case, the line of weld shall be parallel to the horizontal axis of the boiler and the entire plate after flanging shall be subjected to stress relieving and the weld shall be radiographed.
b) The peripheral flanging of end plates shall be done by machine. Such flanging shall preferably be done in one operation, but where this is impracticable sectional or creep machine flanging may be permitted, provided that the plate is worked at a suitable temperature, and the plate is heated to an adequate distance beyond the portion under immediate treatment.
bb) In the construction of unfired boilers when the dished ends do not form a part of the heating surface, cold spun dished ends conforming to IS: 2825 may be used.
c) Care must be taken to see that the flanges are circular and of good surface, free from local irregularities, and that they are parallel and square with the flat part of the plate. For the purpose of relieving internal stresses, all plates which have been flanged or locally heated shall afterwards be efficiently annealed unless during the last stage of manufacture they have been uniformly heated throughout.
d) Flat portions of end plates, on completion of all flanging and machining operations, shall be flat and free from set or distortion.

IBR 1950 regulation 297 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 297 page for its amendments.

Reg. 297, Reg. 298, Reg. 299

Opening in Shell

No accessories other than those integral with the Safety Valve shall obstruct the openings in the boiler shell. Discharging steam shall have direct access to the safety valve without flowing through internal pipes.


Reg. 298

Discharge Passage

The safety valve discharge pipes shall comply with the requirements of clauses (a) and (b) of this regulation. The discharge pipe shall be as short and straight as possible and be fitted with open drain to prevent accumulation water in the pipe. Suitable arrangement shall be provided in the discharge pipe system so that the discharge can readily be heard by the Boiler Attendant.

a) Steam safety valves: -

(i) Ordinary and high lift valves. Where a waste steam-pipe is fitted the pipe and the passage leading to it shall have a cross-sectional area not less than the minimum combined area of the safety valves required by Regulation 293.
(ii) Full lift valves. For full lift valves the area of waste steam-pipe and passages leading to it shall have a cross-sectional area not less than twice A, or such area above this minimum as may be required for valves having a higher approved constant, where A,E and P are as defined in regulation 293.
b) Economiser safety valves. The area of the discharge pipe from an economiser safety valve shall be at least twice the area of the valve seating. Where the discharge from several economiser safety valves is connected to the main discharge pipe, the diameter of the main discharge pipe shall be designed to prevent accumulation of pressure due to the formation of steam under the particular conditions of temperature and pressure which may be applicable.


Reg. 299

Drainage

For each enclosed safety valve chest a means of draining shall be provided. The drain pipe shall be laid with a continuous downward gradient clear of the boiler to a place where the discharge is visible and cannot do injury to any person.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
780
PDF page index
780 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 8536bb7b37eb8a4f
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 470, Regulation 470, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.780. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.