Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction
Regulation 461. Hemispherical Crowns
Not yet checked against the official Gazette; verify before relying on it.
461. Hemispherical Crowns.─ (1) The maximum allowable working pressure for hemispherical crowns subjected to internal pressure shall be determined by the following formula:
𝑃 = ( 𝑡−1.5875) 𝑆 x 𝐶 Equation (12/9)
𝑅
Where, t = is thickness of plate in mm,
P = is the maximum allowable working pressure in kg/cm2(g),
R = is inner radius of curvature in mm,
S = is minimum tensile strength of the plate in kg/cm2,
C = is a constant, as given in sub-regulation (2).
(2)In no case, however, shall the factor of safety to the crown plate be less than 4 ,nor the plate thickness be less than specified in Table 12/4 given under regulation 454.
C = 0.4608 where Class-1 requirements are compiled with,
C = 0.3888 where Class-2 requirements are compiled with,
C = 0.3312 for Class-3 boilers when stress relieved,
C = 0.3024 for Class-3 boilers when stress relieved.
Parts of this extracted text look garbled; read the Gazette page before using any value.
Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
In short
Sets the maximum allowable working pressure for hemispherical crowns under internal pressure.
Key points
- (1) Pressure from Equation (12/9), using plate thickness t (less 1.5875), tensile strength S, inner radius R and constant C.
- (2) The factor of safety must not be less than 4, and plate thickness must not be less than Table 12/4 in regulation 454.
- (2) C = 0.4608 where Class I requirements are met; C = 0.3888 where Class II requirements are met; C = 0.3312 for Class III when stress relieved.
Watch out
- The extracted text also describes C = 0.3024 as "when stress relieved", so the two Class III cases cannot be told apart. Check the Gazette page for the exact wording.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 595 | Hemispherical Furnacesof Vertical Boilers | 79% | Chapter XII (DPIIT scan), image 14 |
IBR 1950 regulation 595 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 595 page for its amendments.
| Reg. 593, Reg. 594, Reg. 595 | |||||||||||||||
Reg. 594 Corrugated Fireboxes of Vertical Boilers
Reg. 595
| |||||||||||||||
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 461, Regulation 461, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.775. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.