Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction

Regulation 447. Nick-break specimen

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 771

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

447.Nick-break specimen .─ (1) This specimen shall have a width not less than one and a half times its thickness and the slot shall be cut in each side of the specimen through the centre of the weld and perpendicular to the outer face of the boiler.

(2)The specimen shall then be broken in the weld and the fracture shall reveal a sound homogenous weld substantially free from slag inclusions, porosity and coarse crystallinity.

Independent explanation — not the law · draft · engineer review in progress

In short

Sets how the nick-break specimen is made and what its fracture must show.

Key points

  • (1) Width at least one and a half times the specimen thickness. A slot is cut in each side through the centre of the weld, perpendicular to the outer face of the boiler.
  • (2) The specimen is broken in the weld. The fracture must show a sound, homogeneous weld substantially free from slag inclusions, porosity and coarse crystallinity.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
420Nick Break Test80%Chapter X (DPIIT scan), image 7
IBR 1950 regulation 420 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 420 page for its amendments.

Reg. 420, Reg. 421, Reg. 422, Reg. 423
TESTS FOR CLASS II FUSION WELDED SEAMS

Nick Break Test

The specimen shall be rectangular in section and cut transversely to the weld so as to have a width not less than one-and-half times its thickness. The slot shall be cut in one side of the specimen through the centre of the weld and perpendicular to the outer face of the vessel. The specimen shall than be broken in the weld and the fracture shall reveal a sound homogeneous-weld, substantially free from slag inclusions, porosity and coarse crystallinity.



Reg. 421
TESTS FOR CLASS II FUSION WELDED SEAMS

Retests

Should any of the tests fail, two retests shall be made on specimens cut from the same plate and both retests shall meet the specified requirements.



Reg. 422
TESTS FOR CLASS II FUSION WELDED SEAMS

Specimens after Tests

If required by the Inspecting Authority, the specimens after test shall be forwarded for examination.



Reg. 423
TESTS FOR CLASS II FUSION WELDED SEAMS

Heat Treatment

All fusion welded electrode boilers shall be stress-relieved by heat-treatment. The heat-treatment shall be in accordance with Regulation 267.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
771
PDF page index
771 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 3ac50a2f608aa0af
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 447, Regulation 447, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.771. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.