Indian Boiler Regulations, 2026 · Chapter 12 · Shell Type Boilers of Welded Construction

Regulation 417. Girder stays for firebox and combustion chamber crowns

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 761

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

417. Girder stays for firebox and combustion chamber crowns.─ (1) Where girder stays are attached with stay bolts and nuts, they shall be bedded to the corners or ends of side plates.

(2)The attachment of girder stays welded directly to the crown plates shall comply with Figures 12/60, 12/61, 12/62, 12/63 or 12/64. Such girders shall be welded to the crown plate prior to stress-relieving.

(3)Each girder shall be of sufficient strength to support its due proportion of the load on the crown plate independently of the crown plate, and the bolts or weld attachments shall have sufficient cross-sectional area to carry the applied load.

(4)The waterways between the underside of the girder and the crown plate shall be as large as practicable, but in no case less than 38 mm deep.

Figures cited in this regulation (5, exact crops of the Gazette)

Gazette Fig. 12/60
Fig. 12/60(no caption printed with this figure)
View Gazette page 812 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
Gazette Fig. 12/61
Fig. 12/61(no caption printed with this figure)
View Gazette page 813 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
Gazette Fig. 12/62
Fig. 12/62(no caption printed with this figure)
View Gazette page 813 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
Gazette Fig. 12/63
Fig. 12/63(no caption printed with this figure)
View Gazette page 813 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
Gazette Fig. 12/64: Typical Methods of Fittings Welded Grinders to Welded Combustion Chambers and Fireboxes
Fig. 12/64Typical Methods of Fittings Welded Grinders to Welded Combustion Chambers and Fireboxes
View Gazette page 813 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 417 covers girder stays for firebox and combustion chamber crowns.

Key points

  • (1) Girder stays attached with stay bolts and nuts must be bedded to the corners or ends of the side plates.
  • (2) Girders welded directly to crown plates follow the listed figures and must be welded before stress-relieving.
  • (3) Each girder must carry its share of the crown plate load independently of the crown plate. Bolts or weld attachments need enough cross-sectional area for the load.
  • (4) The waterway between the underside of the girder and the crown plate must be as large as practicable, and never less than 38 mm deep.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
761
PDF page index
761 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 94a7fa495844db3b
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 417, Regulation 417, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.761. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.