| Reg. 55 MATERIALS OF CONSTRUCTION SEAMLESS FERRITIC PIPES FOR HIGH TEMPERATURE SERVICE Additional tests before rejection |
| (i)If any one or more tests specified in these regulations fail, two further tests of the same kind may be made on two other pipes of the same batch. If any of these tests fails, the batch of the pipes represented may be given a further heat treatment and entire set of tests shall be repeated. (ii) If the repeat tests are satisfactory, the pipes shall be accepted. If any failure in the tests should occur the entire batch of the pipes shall be rejected. |
Earlier text: the 2008 DIPP web edition
MATERIALS OF CONSTRUCTION
SEAMLESS CHROMIUM-MOLYBDENUM STEEL BOILER AND SUPER HEATER TUBES FOR DESIGN METAL TEMPERATURES NOT EXCEEDING 538 DEGREE C (1,000 DEGREE F).
Additional tests before rejection
Should a tube selected for testing purpose show definite signs of failure in any one or more of the tests specified in Regulation 54(a), 54 (b) and 54(c), two further tests of the same kind may be made at the option of the manufacturer from two additional selected test tubes. If the repeat tests are satisfactory the tubes shall be accepted provided in all other respects they fulfil the conditions of this standard. Should either of the tubes fail in any test, the batch of tubes represented may be re-heat-treated in accordance with Regulation 53(b) and then retested in accordance with Regulations 54(a), 54(b) and 54(c) but employing twice the number of test pieces.
If these second repeat tests are satisfactory, the tubes shall be accepted provided that in all other respects they fulfil the conditions of the standard; but if definite defects are again shown, the batch of tubes which the test pieces represent shall be rejected.
Amendments found
Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.
| Date | Notification | Part | Action | What changed (summary) | Web edition |
|---|---|---|---|---|---|
| 2001-04-10 | G.S.R. 219 | Substituted | Replaced as part of the block substitution of regulations 36 to 56 (tube specifications). | listed before the capture |