Indian Boiler Regulations, 2026 · Chapter 2 · Materials of Construction
Regulation 70. Additional tests
Not yet checked against the official Gazette; verify before relying on it.
70. Additional tests.─ The additional tests shall be carried out in accordance with the Table 2/43 before a casting
| Serial No. | Test piece | Event | Conditions |
|---|---|---|---|
| (1) | (2) | (3) | (4) |
| 1. | 1st | If this fails | The second test piece shall be tested. |
| 2. | 2nd | If this passes | The batch or separate casting represented shall be accepted. |
| 3. | If this fails | The batch or separate casting represented may be rejected. | |
| 4. | Provided that in the case of failure of both test pieces if either show obvious defects a third test piece may be taken from a broken casting or a piece may be cut from a unable casting for further testing as follows: | ||
| 5. | 3rd | If this passes | The batch or separate casting represented shall be accepted. |
| 6. | If this fails | The batch or separate casting Represented may be rejected. | |
Table structure read from the Gazette PDF, page 552. Verification status as for the text above.
Table 2/43
Show original extracted text (diagnostic, not authoritative)
or batch of castings, if rejected:
Table 2/43
Serial No. Test piece Event Conditions
(1)
(2) (3) (4)
1. 1st If this fails The second test piece shall be tested.
2.
2nd If this passes The batch or separate casting represented shall be
3.
accepted.
4.
If this fails The batch or separate casting represented may be
5.
rejected.
6.
Provided that in the case of failure of both test pieces if either show obvious defects a third test
piece may be taken from a broken casting or a piece may be cut from a unable casting for further
testing as follows:
3rd If this passes The batch or separate casting represented shall be
accepted.
If this fails The batch or separate casting Represented may
be rejected.Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
In short
Regulation 70 sets the retest sequence (Table 2/43) to be followed before a grey iron casting or batch of castings is rejected.
Key points
- If the 1st test piece fails, a 2nd test piece is tested.
- If the 2nd passes, the batch or casting is accepted. If it fails, the batch or casting may be rejected.
- Proviso: if both test pieces fail and either shows obvious defects, a 3rd test piece may be taken from a broken casting, or cut from a casting, for further testing.
- If the 3rd passes, the batch or casting is accepted. If it fails, it may be rejected.
Watch out
- After a failure the text says the casting "may be rejected", while a pass means it "shall be accepted".
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 55 | Additional tests before rejection | 100% | Chapter II (DPIIT scan), image 10 |
| 66 | Additional Tests | 100% | Chapter II (DPIIT scan), image 13 |
Amendment history of the candidate IBR 1950 regulations: Reg. 55 (1 amendment)
IBR 1950 regulation 55 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 55 page for its amendments.
| Reg. 55 MATERIALS OF CONSTRUCTION SEAMLESS FERRITIC PIPES FOR HIGH TEMPERATURE SERVICE Additional tests before rejection |
| (i)If any one or more tests specified in these regulations fail, two further tests of the same kind may be made on two other pipes of the same batch. If any of these tests fails, the batch of the pipes represented may be given a further heat treatment and entire set of tests shall be repeated. (ii) If the repeat tests are satisfactory, the pipes shall be accepted. If any failure in the tests should occur the entire batch of the pipes shall be rejected. |
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 70, Regulation 70, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.552. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.