Indian Boiler Regulations, 2026 · Chapter 2 · Materials of Construction

Regulation 41. Additional tests before rejection

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 521

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

41. Additional tests before rejection.─(1)(a) If the test pieces first selected by the Competent Person fail to fulfil the test requirements under these regulations, two further tests of the same heat may be made, but if either of these fail, the plates or bars from which test pieces were cut shall be rejected.

(b)In all such cases further tests shall be made before any material from the same charge can be accepted.

(2)If the unsatisfactory result of a test is due to technical conditions of the testing method or to a closely limited defect of a test piece, then, the failure can be left out of consideration in the decision on the fulfilment of the requirement and another test piece may be substituted.

(3)If the unsatisfactory result of test is due to an unfavourable heat treatment, the plate and the test strip may be heat treated again and thereafter, the entire test shall be repeated.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 41 sets when failed plate or bar tests may be retested or set aside before material is rejected.

Key points

  • (1)(a) If the first test pieces selected by the Competent Person fail, two further tests from the same heat may be made. If either fails, the plates or bars from which the test pieces were cut are rejected.
  • (1)(b) In all such cases, further tests are needed before any material from the same charge can be accepted.
  • (2) A failure caused by the testing method or by a closely limited defect in the test piece may be disregarded, and another test piece substituted.
  • (3) A failure caused by unfavourable heat treatment allows the plate and test strip to be heat treated again, and the entire test is then repeated.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
55Additional tests before rejection100%Chapter II (DPIIT scan), image 10
66Additional Tests100%Chapter II (DPIIT scan), image 13

Amendment history of the candidate IBR 1950 regulations: Reg. 55 (1 amendment)

IBR 1950 regulation 55 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 55 page for its amendments.

Reg. 55
MATERIALS OF CONSTRUCTION

SEAMLESS FERRITIC PIPES FOR HIGH TEMPERATURE SERVICE

Additional tests before rejection

(i)If any one or more tests specified in these regulations fail, two further tests of the same kind may be made on two other pipes of the same batch.  If any of these tests fails, the batch of the pipes represented may be given a further heat treatment and entire set of tests shall be repeated. 

(ii)  If the repeat tests are satisfactory, the pipes shall be accepted. If any failure in the tests should occur the entire batch of the pipes shall be rejected.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
521
PDF page index
521 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 8e0ee20e1f39338e
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 41, Regulation 41, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.521. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.