Regulation 62. Additional tests before rejection

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 548

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

62. Additional tests before rejection.─ (1) In case either a tensile or a bend test fails, two further tests of the type which failed may be made on test pieces out from the same forging. If the results obtained from these retests are satisfactory, the forging shall be accepted, provided that in other respects they fulfil the conditions laid down above for steel forgings. If these retests do not give satisfactory results, the forgings represented may be re-heat-treated together with the remainder of the test blocks and presented for further testing.

(2)In all cases where final retests do not give satisfactory results, the forgings represented by the test pieces which fail shall be rejected.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 62 gives steel forgings a second chance when a tensile or bend test fails, and says when the forgings must finally be rejected.

Key points

  • (1) If either a tensile or a bend test fails, two further tests of the failed type may be made on test pieces from the same forging.
  • If both retests are satisfactory, the forging is accepted, provided it meets the other conditions for steel forgings.
  • If the retests are not satisfactory, the forgings may be re-heat-treated together with the rest of the test blocks and presented for further testing.
  • (2) Where the final retests are still unsatisfactory, the forgings represented by the failed test pieces are rejected.

Watch out

  • Retests are only of the type that failed, and acceptance still depends on the forging meeting all other requirements.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
55Additional tests before rejection100%Chapter II (DPIIT scan), image 10
66Additional Tests100%Chapter II (DPIIT scan), image 13

Amendment history of the candidate IBR 1950 regulations: Reg. 55 (1 amendment)

IBR 1950 regulation 55 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 55 page for its amendments.

Reg. 55
MATERIALS OF CONSTRUCTION

SEAMLESS FERRITIC PIPES FOR HIGH TEMPERATURE SERVICE

Additional tests before rejection

(i)If any one or more tests specified in these regulations fail, two further tests of the same kind may be made on two other pipes of the same batch.  If any of these tests fails, the batch of the pipes represented may be given a further heat treatment and entire set of tests shall be repeated. 

(ii)  If the repeat tests are satisfactory, the pipes shall be accepted. If any failure in the tests should occur the entire batch of the pipes shall be rejected.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
548
PDF page index
548 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 06416af766594106
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 62, Regulation 62, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.548. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.