BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 4 · Fusion Welded Drums for Water Tube Boilers and Superheaters

Regulation 163. Additional tests before rejection

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 594–595

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

163. Additional tests before rejection.─ (1) In case any of the test specimens taken in accordance with regulations 156 to 162 fail to meet the specified requirements, one retest shall be allowed for each specimen that fails, provided the following minimum figures have been obtained.

(a)Reduction in area 30 per cent.

(b)Any other test except the bend and impact tests, 90 percent of the specified requirements.

(2)In case, a cold bend specimen fail to meet the specified requirements, two re-tests shall be taken from the same test plate and these shall comply with the requirements of regulations 160 and 161.

(3)If Charpy impact test fails to meet the specified requirements, two re-tests shall be taken from the test plate on each side of the original specimen and separated from it by not more than 5 mm. Both re-tests shall show a minimum Charpy impact test value of 2.76 kgfm.

(4)If it is found that there is insufficient metal to permit the preparation of specimen for re-test from the reminder of the test may be cut from the test plate relating to the opposite and of the same longitudinal seam.

Referenced provisions

Reg. 156 · Reg. 160 · Reg. 161 · Reg. 162

Independent explanation — not the law · draft · engineer review in progress

In short

If a test specimen under regulations 156 to 162 fails, retests are allowed under the conditions in regulation 163.

Key points

  • (1) One retest per failed specimen, provided the original reached at least 30 per cent reduction in area and, for tests other than bend and impact, 90 percent of the specified requirement.
  • (2) A failed cold bend specimen allows two retests from the same test plate, which must meet regulations 160 and 161.
  • (3) A failed Charpy test allows two retests from the test plate, one on each side of the original and within 5 mm of it. Both must reach at least 2.76 kgfm.
  • (4) If there is not enough metal left, retest specimens may be cut from the test plate at the opposite end of the same longitudinal seam.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
55Additional tests before rejection100%Chapter II (DPIIT scan), image 10
66Additional Tests100%Chapter II (DPIIT scan), image 13

Amendment history of the candidate IBR 1950 regulations: Reg. 55 (1 amendment)

IBR 1950 regulation 55 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 55 page for its amendments.

Reg. 55
MATERIALS OF CONSTRUCTION

SEAMLESS FERRITIC PIPES FOR HIGH TEMPERATURE SERVICE

Additional tests before rejection

(i)If any one or more tests specified in these regulations fail, two further tests of the same kind may be made on two other pipes of the same batch.  If any of these tests fails, the batch of the pipes represented may be given a further heat treatment and entire set of tests shall be repeated. 

(ii)  If the repeat tests are satisfactory, the pipes shall be accepted. If any failure in the tests should occur the entire batch of the pipes shall be rejected.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
594–595
PDF page index
594–595 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash a133073c70c08234
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 163, Regulation 163, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.594–595. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.