Indian Boiler Regulations, 2026 · Chapter 4 · Fusion Welded Drums for Water Tube Boilers and Superheaters
Regulation 148. Constructional details and preparation for welding
Not yet checked against the official Gazette; verify before relying on it.
148. Constructional details and preparation for welding.─ (1) Before starting the construction work, the manufacturer shall furnish to Inspecting Authority, a fully dimensioned sectional drawing reflecting therein complete details of construction of the drum for approval.
(2)Fully dimensioned drawings of the proposed welds preparations of the main seams drawn to a scale, clearly reflecting therein all the relevant details shall be furnished.
(3)Sketches showing details of the welds preparations for the attachment of the stand pipes, branch pipes and seating and their locations relative to the longitudinal and circumferential seams and to other openings shall be furnished.
In short
Before construction starts, the manufacturer must submit drawings to the Inspecting Authority.
Key points
- (1) A fully dimensioned sectional drawing with complete drum construction details, for approval.
- (2) Fully dimensioned, scaled drawings of the weld preparations for the main seams.
- (3) Sketches of weld preparations for stand pipes, branch pipes and seatings, and their positions relative to the longitudinal and circumferential seams and other openings.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 8 | Welding | 100% | Chapter I (DPIIT scan), image 3 |
| 524 | Preparation for inspection | 73% | Chapter XI (DPIIT scan), image 7 |
Amendment history of the candidate IBR 1950 regulations: Reg. 8 (2 amendments)
IBR 1950 regulation 8 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 8 page for its amendments.
| Reg. 8 Welding:- |
| (a) The use of welding in the construction of boilers shall be permitted only where specifically provided for in the standard conditions. |
IBR 1950 regulation 524 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 524 page for its amendments.
| Reg. 524, Reg. 525 REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | |||||||||||||||||||
| |||||||||||||||||||
|
REGULATIONS FOR REGISTRATION AND INSPECTION OF ECONOMISERS AND FEED PIPES | |||||||||||||||||||
|
| Next >>> |
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 148, Regulation 148, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.586–587. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.