Indian Boiler Regulations, 2026 · Chapter 4 · Fusion Welded Drums for Water Tube Boilers and Superheaters
Regulation 166. Heat treatment
Not yet checked against the official Gazette; verify before relying on it.
166. Heat treatment.─(1) (a)After completion of the welding of the seams and the welding on the stand pipes and including welding repairs but before the hydraulic test, each drum shall be heat treated for stress relieving; during this heat treatment the official test plates shall be lying inside the drum.
(b)For heat treatment requirements refer regulation 123.
(2)Where shell is subjected to a primary stress relieving treatment identical to the final heat treatment to be given to the drum, the test plates may be placed inside the shell during the primary treatment and thereafter cut up and tested without waiting for the final treatment of the drum.
(3)Where the shell is not subjected to primary stress relieving treatment or is subject to a primary stress relieving treatment which is not identical with the final heat treatment, the test plates may be placed inside any other drum of comparable dimensions which is to be heat treated in accordance with this Chapter. The heat treatment is to take place in the furnace in which the drum relating to the test plates will eventually be given its final heat treatment.
(4)Temperature charts shall be submitted to indicate that the test plates and the drum they represent have been subjected to identical heating soaking and cooling treatment.
(5)(a) For the heat treatment, the drum shall be placed in a furnace sufficiently larger to accommodate the whole drum.
(b)The furnace shall have proper means of temperature measurement and control and shall be capable of heating the whole of the drum to a uniform temperature. It shall be so designed as to prevent direct impingement of flame on the drum.
(c)Thermocouples shall be attached to the drum at appropriate locations. A temperature time diagram of the stress-relieving process shall be provided for a welded shell or drum and a similar diagram for other welded pressure part shall be provided where inspecting Authority requires it.
(6)Alternative procedure for the heat treatment of the drum may be submitted to the inspecting Authority for approval.
(7)In special cases it may be permissible to heat treat the test plates separately from the drum, provided the inspecting Authority is satisfied with the means adopted to ensure that the following factors shall be the same for the drum as for the test plates, namely:-
(i)Rate of heating
(ii)Maximum temperature
(iii)Time held at maximum temperature
(iv)Conditions of cooling.
In short
Each drum must be stress relief heat treated after all seam, standpipe and repair welding and before the hydraulic test, with the official test plates inside the drum. Requirements are in regulation 123.
Key points
- (2) If the shell gets a primary stress relief identical to the final one, test plates may be treated then and tested without waiting.
- (3) Otherwise, test plates may go inside another drum of comparable size being heat treated under this Chapter, in the same furnace that will do the final treatment.
- (4) Temperature charts must show identical heating, soaking and cooling of plates and drum.
- (5) The furnace must hold the whole drum, measure and control temperature, heat uniformly and prevent direct flame impingement. Thermocouples go on the drum, and a temperature-time diagram is provided.
- (6) An alternative procedure may be submitted to the Inspecting Authority for approval.
Watch out
- (7) Test plates may be heat treated separately only in special cases, and only if the Inspecting Authority is satisfied that heating rate, maximum temperature, holding time and cooling conditions are the same as for the drum.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 348 | Method of manufacture, Heat treatment and Marking | 100% | Chapter VIII (DPIIT scan), image 3 |
| 423 | Heat Treatment | 100% | Chapter X (DPIIT scan), image 7 |
| 629 | Heat Treatment | 100% | Chapter XV (DPIIT scan), image 2 |
Amendment history of the candidate IBR 1950 regulations: Reg. 348 (1 amendment)
IBR 1950 regulation 348 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 348 page for its amendments.
| Reg. 348 Method of manufacture, Heat treatment and Marking
|
IBR 1950 regulation 423 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 423 page for its amendments.
| Reg. 420, Reg. 421, Reg. 422, Reg. 423
Reg. 421
Reg. 422
Reg. 423
|
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 166, Regulation 166, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.597. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.