Regulation 348 — Method of manufacture, Heat treatment and Marking

Unofficial DPIIT web edition · not verified1 amendment found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine). The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette
Reg. 348

Method of manufacture, Heat treatment and Marking

a) (i) The cold drawn seamless carbon steel pipes and welded carbon steel pipes shall be supplied in normalised condition

(ii) Hot finished seamless carbon steel pipes shall be supplied in hot finished condition or in normalised condition at the option of the manufacturer.

(iii) The seamless alloy steel pipe either cold finished or hot finished and welded pipes shall be supplied in normalised and tempered condition.

(iv) By agreement between the users and the manufacturer, the pipes may be delivered in a condition other than normalised and tempered condition in which case they shall be suitable for subsequent manipulation and the user shall be informed of the heat-treatment necessary to give required properties.
b) (i) Pipe bending and forming (viz. reducing/swaging) operation shall be done by any hot or cold method and to any radius which shall result in a surface free from cracks, buckles or other defects as determined by the method of inspection specified in the design. A post bending or post forming heat-treatment for carbon steel material is required with a nominal wall thickness in excess of 19.0 millimetres unless the bending or forming operation are performed and completed at normalizing temperatures, where no further heat treatment is required. The heat treatment where required shall be normalized or stress-relieved, as the case may be.

(ii) A post bending or post forming heat treatment shall be required for all ferritic alloy steel material with nominal pipe size 100.00 millimetres and larger or with a nominal thickness 13.0 millimetres or greater.

(iii) If hot bending or forming is performed, the material shall receive normalize and temper or tempering heat-treatment as required by the design. For cold operation, tempering heat-treatment shall be applied.
c) Marking:-Marking shall be carried out in accordance with regulation 395F.
Earlier text: the 2008 DIPP web edition

Method of manufacture, Heat treatment and Marking

a)(i) The cold drawn seamless carbon steel pipes and welded carbon steel pipes shall be supplied in normalised condition

(ii)Hot finished seamless carbon steel pipes shall be supplied in hot finished condition or in normalised condition at the option of the manufacturer.

(iii)The seamless alloy steel pipe either cold finished or hot finished and welded pipes shall be supplied in normalised and tempered condition.

(iv)By agreement between the users and the manufacturer, the pipes may be delivered in a condition other than normalised and tempered condition in which case they shall be suitable for subsequent manipulation and the user shall be informed of the heattreatment necessary to give required properties.

b)(i) Pipe bending and forming (viz. reducing/swaging) operation shall be done by any hot or cold method and to any radius which shall result in a surface free from cracks, buckles or other defects as determined by the method of inspection specified in the design. A post bending or post forming heat-treatment for carbon steel material is required with a nominal wall thickness in excess of 19.0 millimetres unless the bending or forming operation are performed and completed at normalizing temperatures, where no further heat treatment is required. The heat treatment where required shall be normalized or stress-relieved, as the case may be.

(ii)A post bending or post forming heat treatment shall be required for all ferritic alloy steel material with nominal pipe size 100.00 millimetres and larger or with a nominal thickness 13.0 millimetres or greater.

(iii)If hot bending or forming is performed, the material shall receive normalize and temper or tempering heat-treatment as required by the design. For cold operation, tempering heat-treatment shall be applied.

c)Marking:-Marking shall be carried out in accordance with regulation 395F.

Amendments found

Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.

DateNotificationPartActionWhat changed (summary)Web edition
1997-03-19G.S.R. 172 OCR of scan(b), (c), (d)SubstitutedReplaces provisions on pipe heat-treatment condition, post-bending/forming heat treatment, and marking (per regulation 395-F).
Uncertain: OCR shows '(1)), (c) and (d)' and substituted text lettered '(a)...N...(C)'; marking cross-reference '395-F' may be garbled.