What it amends (editorial summary, pending verification)

Amends IBR 1950 regulations 3, 348, 374, 561 and 601: adds a requirement that manufacture, fabrication and heat treatment conform to the specified codes, substitutes the heat-treatment, bending/forming and marking provisions for pipes in 348, substitutes 374(f) on hydraulic testing of fabricated pipes, substitutes tensile-test and macro/micro-examination clauses and figures in 561(b), and substitutes regulation 601 on hydraulic and hammer tests.

Scanned weekly Gazette of India (Part II, Section 3(i)) of 29th March, 1997, as hosted by India Code and archived by the Wayback Machine (capture 2022-02-10). The scan also contains other notifications; only the Central Boilers Board notification is reproduced here. Reader's note: Two-column OCR interleaving: lines 651 and 653 ('shall be supplied in normalised and tempered condition') belong to 348 item (iii). Clause 5 (561) continues on page 6 with page header at 793-795. Draft G.S.R. 96 dated 9 Feb 1996, published 20 Feb 1996 at pages 525-529, available 27 Feb 1996. File No. 6(6)/95-Boilers (garbled), V. K. Goel, Secy. Footnote (garbled) lists up to GSR 59 of 25 Jan 1997, omitting GSR 117 of 1 March 1997. Lines 1-649 are other notifications and Hindi.

Gazette scan (India Code copy, archived). Regulation numbers below refer to the IBR 1950, not the IBR 2026.

IBR 1950 regulation numbers appearing in the notification (includes incidental references; verification pending): 3, 348, 374, 395-F, 561, 601

Not yet checked against the official notification (read from a scan by OCR); verify before relying on it.

Official text · Gazette notification · English portion · OCR, verification status above

MINISTRY OF INDUSTRY
shall be supliccl in normalised and tem-
(Deparflnent of Industrial Development)
pered rendition,
Central Boilers Board
New Delhi, the 19th March, 1997
(3S.R. 172—Whereas certain draft rcgiilations,
further to amend the Indian Boiler. Rçgulations,
1950, were published as xequiredby
b-aoctin (1)
,af section 31 of the Indian. Boi1ersAct,j923 (5 of
1923) at pages 525 to 529 of the Gazeuo of India,
Port-11, Secton 3, Sub-section (1), thtcd ihe 20th
February, 1996 under the notification of the Govern-
ment of India in the Ministry of Industry (Depart-
ment of Industrial Development) (Central Boilers
Board number G.S.R. 96, dated 9thFebrury, 1996
inviting objections and itgges0ons from all pct'soos
likely to be affected thereby tIFthc expiry of a
period of forty-five days from. the date on which
copies of the Gazetc in which the said .tiflcation
was published were made available to the public
And ,licreus the said Gazette was made available.
to the public on the 27th February, 1996
And whereas the objections and suggestions recev-
ed have been considered by the Central Boilers
Board
Now, therefore, in exercise of the powers confer-
red by section 28 of the Indian Boilers Act, 1923
(5 of 1923), the Central Boilers Board hereby makes
the following regulations further to amend the
Indian Boiler Regdintions. 1950. nnmely

I. C I ) 1hce regulations may be called the Indian
Boiler (Second Amendment) Regulations.
1997.

(2)They shall come into force of the date of
their publication in the Official Gazette,

2. In the Indian Boiler Regulations, 1950 (here-
inuftcr ieferrecl as the said regulations), in regula-
tion 3, in sub-regulation (2), in paragraph (i), the
following ',huil be added, at the end, namely :-
"and that the methods of manufacture, faboca-
lion and heat treatment conform to the
soecilied Codes or Stan(lards.".

3. In the sold tegulations, in regulation 348, for
'ub-regulatiens (1)), (c) and (d) the following sub-
regulatfons shall be substituted, namely :-
"(a) (1) The cold drawn seamless carbon Acel
pipes and ucided carbon steel pipes
shall he supplied in nonnalised condi

(ii)Hot finished seamless caon steel pipes
shall be supplied in hot finished condi-
tion or in normalised condition at the
option of the manufacturer.

(iii)The seamless alloy steel pipe either told
finished or hot finished and welded pipes
CV) By agreement between the users and the
manufacturer, the pfpc s may be deliver-
ed in a ceiiciition otter than normalised
and tempered condition in which case
they shall he suitab! for subsequent
manipulaticn and the user shall be in-
formed of the ticut-treatinent necessary to
Five required properties.
N (i) P1;: bending and farming (viz, reducing/
swaging) operation shall be clone by any
hot or cold method and to any radius
:titch shall result in a surface freis from
cracks, buckles or other defects as deter-
mined by ilic method of inspecticn spe-
ciFied in the dssign. A post bending or
post forming heat-treatment for carbon
steel matcriol is required with a nominal
wall thickness in CXCCSS of 19.0 nii!li-
metres unless the bending or forming
r'peration are performed end completed
at normalizng temperatures, where no
further heat treatment is required. The
heat treatment where required shall he
rc,rmahzed or rcss-rclicved, as the ease
may be,

(o)A past bending or post forming heot
treatment shall be require for all fcrrhc
a/oy steel material with nominal pijea
ze 100.00
millimetres and lareer or
with a nominal thickncsç 13.0 millimet-
res or greater.
(Iii) If hot licn(ling or forming is performed
the material shall received normalize
and temper or tempering heat-treatment
as required by the design. For cold
operation, tempering heat-treatment shall
he applied.
(C) Markn ,—Marking shall be carried out in
accordance with regulation 395-F."

4. In the said regulations, in regulation 374, for
sub-regulation

(f), the
fcllowing
sub-regulation
halI be substituted, namely
'(f) hydraulic testing of fabricated pipes hay
iu attiicl'niens of (lanoes, fittings, butt
ioincs, branch joints and weldolets shall
ho tjoric at manufacturer's works or alter-
natively at site at 1.5 times the desin
pressure. Where hydraulic testing of fob-
nieaied pipe joints is not carried cut at
manufacturer's works, dyc-penetrant test
hail be carried out 00 the welded joints
ilongith five per cent radiography at
'inch joints."

5. In the said regulations, in regulation 561, in
tih rL'rulntirn (b )

Specimen Ia
tsccicced Section Tensile Secimen

(i)fl the thickness of the plate does not
exceed 30 millimetres. the thickness of
I he specimen shall be equal to the plate
thickness and the plate surface of the
specimen shall be machined to take
away the
surface irregfilaiiiies of th.
plate and the weld,

(ii)if the plate thickness exceeds 30 milli-
metres, the tensile test shall be
carried
out on several reduced section specimens,
each having a thickness of at least 30
millimetres and width at the
effective
cross-secton of at least 25 millimetres.
Tnese specimens shall be taken out of
thc test piece in such
-a way that the
145
THE GAZETTE OF INDIA : MARCH 29, 1997/CHA1TRA 8, 119
[PART TI—See. 3(i)]

(i)for clause (ii), the following shall be
tehsihi test covers the whole thickness cf
substituted, namely :—
the weld joints as shown in figure 60-1
--

(h). The tensile strength shall not be
('r ) Teitsile tests
:—

!. 	 ,,, i1 , 	 r;.,,a 	
-4l 	 ___ 

(a)

(i)

1¼. 3' 	'IlOLL 	II'. 	 (LISYfl.j 	 LiUilli 	

'Lii
the plate.
WLlded joint—The dimensions of the
educed tensile section shall be as shown
in figure 60-1(a), The width of the-
reduced section shall be itt least 25 milli-
metres,

(b)All weld metal—The dimensions of the
all weld metal tensile test specimen shall
be those given in figure 63. The diameter
shall be the maximum possible consistent
with the cross section of the weld but in
I
case pore than 20 mlm
metres. the gauge
length shall be equal to five times the dia-
aetem'. The tensile strength shall not be
les. than the lower limit specified for the
plate. The elongation shall not be less
than 20 per cent on a gauge length of
four times the square root of the cross-
scctonai area of the specimen, and the
reduction in area not less than 35 per
cent."

(ii)for clause (v), the
following clause shall be
substituted, namely :-
"(v) Macro and Micro examination —A spe-
ciwen of the full thickness of the plate and
not less than 13 rnllimctres wide shall be
i'ovdcd from each set of test plates for
the purpn ct macro and micro examina-
tions.
54 crc-etching ct it complete cross-section Of the
weld
inud'iw the
heat affected
zone.
should show satisfactory
penetration. fu-
mid absence Of significant inclusions
or ether defects.
Should there be any doubt as
tO the conditmo'
of the weld as shown by macro-etching, the
area concerned is to be microscopically
e.-oinnietl for defect investigation."

(ili)for hurc Xll/h(' lt.e following tigur sha
he s bstitut iat, ianie]y : -
Specimen lb
Reduce's Section Tensile Specimen
r1 ate

Figure Xll/61
on,
U)
U)
in
a
thicK l45

(iv)For figure X11/3. thi I Uow'ri, figure shall be suhstilnted, nanu. LT7
dIu3 do
(
tic
L&J!!
h do
7'ensJe Test all weld metal

Figure )fi 1/63

6. In the said
FCOu lilt i( 1 rls, for
regulation 601
the following shall he subsi i u ted, n antelv -
HefitrIulic nnd Hummer Tests
(a
(i I Class I Boilers
—Each Class I Bolcr
shalt, on completion of alt welding and/
01' 'C il -s arid after heat-treatment, be
'ii hjceted to a hvd'au] ic test of 1.5 times
the design pressure without any indica-
tion of weaf.ncss or defect.

(ii)Cluss II and Class III Boilers 'Lach
('las 11 and Oa.s s 111 Boilers shall be
Lesleil lii
1 ]ussure twice the de-ign
pressure.

(b)(1) the Test shall he witimsed by the Inspec-
ting Authority or TnspeCtin
011icei'
TIe test
ll L.SSlll'e shall be
maintaiflc:'
for a pril not ls than 30 minutes.
It is ml prirtinit in the in tei'i'Sl of safety that tite
boiler be propel l vented, so as to prevent the for-
mellon of air poCle1s. before the test pressure as
Notcs
.1.
It
is
i'CCOl1lI11Cilla(I 111a
ih_'
(v'rlll)eIJtIlt'e
(
the o'aO'r
shotiht 110t he
JeSS than 76
ta ril

11w hydraulic tcst

2.

It is further rcconinicnded that before the
bode rs approached for close
CXLLWIfl3-
lion, he prcsstire shall be rcdce.d to hot
less than 1.1 times the design pressure
C1I1L 1
not more than ((() tines th' lvdrauhic tese
pressure.
3,
On eouipletinii (it' hydraulic tes(, release of
pi essiir' shall be gradual.

4.
I)eticctun ol dill'eieilt preSSilte parts shall
he e.taniined carefully and there shalt not
he ally permanent set after release of pre-
csure.

(c)If tiiv ,:pairs are found to be riecessar"
cliiiing or subsequent to the
hydraulic
pressure lest, the boiler
sit all again h'
coheetcd it the
pressure test spccied
uboe at tar
cupleth.tii of the
repair:,
, rid after ally heat treatment
()h'eis .0 oils dud
TClilUl k. of lllpoetIng Offi -
i tmpeetiiic ,'\utlioritv should be recold-
Cd
lint I no wi th makers tapers.'.
[bile No. 61,6 . 95 -UtlitersI

V. K. (30Et.. Sec'
Footnote —The principal regulations were publish-
Cii lIt tlt Gazette of India
1,$ S.RO. No.
old), dated 15th September, I 950 and last
an IL: iicled vide Gnette notificatlon : -
(1 5 f(,
I 35 dated 241h March. 1990
it (SR
179, dated 24th
t\Tarch.
1990-
GS
-RS. dated Qib
October,
1993,
(iv I CSR
a' JO. tInted 23rd
Octtahci,
1993.
Is
1

(')SR
034, dated 25th
December.
19 1)1.
I vi I GSIt
07, dated 2oth
Fehrulalv.
1994
(Ctiai'igeitduiu GSR 223, dated
14th Ma,
1994).
I \ it GS

250. itaft'd 40h
,hlinC, 19Q4.
I tii
GSR
0')2. dated 121h
August,
1994.
lx ) (ISR 427, dated 20th
August.
1994,
It I (ISR
5n2, dated 12(h
Novembei',
1994.
I s i
(1SR
667, dated 10111
Decemhr,
I004,
I 0 I (1SR
3
dated 25th r- ehri:irs - . 1995
I 'wit GSR 93 dated 41h
March,
1095.
sit I GSR
.45,
(jdlled 9th November.
1996,
Isv) GSR 52. Uttled
25111
December,
1996.
') GSR 59, dated 25th
January,
1997.