- 142. General requirements
- 143. Materials of construction for fusion welded Boiler Drums
- 144. Fusion Welded Drums
- 145. [No printed heading] “This Chapter shall apply to the single run…”
- 146. Equipment of workshop
- 147. Testing Laboratory
- 148. Constructional details and preparation for welding
- 149. Preparation of plates
- 150. Cylindrical Shell of Drums
- 151. Method of making welded joints
- 152. Type of welded joints
- 153. Number of joints
- 154. Position of the tube holes
- 155. Circularity of drums
- 156. Mechanical test and test plates of fusion welded seams
- 157. Selection of test pieces*
- 158. Tensile test pieces
- 159. Tensile tests
- 160. Bend test pieces
- 161. Bend tests
- 162. Notched-bar-impact test
- 163. Additional tests before rejection
- 164. Non-Destructive test
- 165. General
- 166. Heat treatment
- 167. Hydraulic test at makers’ works
- 168. Inspection during construction
- 169. Shell of steam and water drums
- 170. Permissible working stresses for shells of boiler and integral super heater drums and headers
- 171. Efficiency of ligament
- 172. Longitudinal stress
- 173. Intermediate boiler drum supports
- 174. Shape of dished end plate
- 175. General
- 176. Dished end with opening
- 177. End plate subject to pressure on the concave side
- 178. Internal doors
- 179. Stand Pipes, nozzles and openings
- 180. Attachment of stand blocks and branch pipes by welding