Indian Boiler Regulations, 2026

Chapter 4 — Fusion Welded Drums for Water Tube Boilers and Superheaters

39 regulations (142–180)Gazette starts p.586

Regulation headings are not yet verified against the official Gazette. Entries in [square brackets] are editorial navigation labels, not Gazette wording.

← Chapter 3: Construction and Workmanship · Chapter 5: Valves, Gauges and Auxiliaries → · Figures in Chapter 4

  1. 142. General requirements
  2. 143. Materials of construction for fusion welded Boiler Drums
  3. 144. Fusion Welded Drums
  4. 145. [No printed heading] “This Chapter shall apply to the single run…”
  5. 146. Equipment of workshop
  6. 147. Testing Laboratory
  7. 148. Constructional details and preparation for welding
  8. 149. Preparation of plates
  9. 150. Cylindrical Shell of Drums
  10. 151. Method of making welded joints
  11. 152. Type of welded joints
  12. 153. Number of joints
  13. 154. Position of the tube holes
  14. 155. Circularity of drums
  15. 156. Mechanical test and test plates of fusion welded seams
  16. 157. Selection of test pieces*
  17. 158. Tensile test pieces
  18. 159. Tensile tests
  19. 160. Bend test pieces
  20. 161. Bend tests
  21. 162. Notched-bar-impact test
  22. 163. Additional tests before rejection
  23. 164. Non-Destructive test
  24. 165. General
  25. 166. Heat treatment
  26. 167. Hydraulic test at makers’ works
  27. 168. Inspection during construction
  28. 169. Shell of steam and water drums
  29. 170. Permissible working stresses for shells of boiler and integral super heater drums and headers
  30. 171. Efficiency of ligament
  31. 172. Longitudinal stress
  32. 173. Intermediate boiler drum supports
  33. 174. Shape of dished end plate
  34. 175. General
  35. 176. Dished end with opening
  36. 177. End plate subject to pressure on the concave side
  37. 178. Internal doors
  38. 179. Stand Pipes, nozzles and openings
  39. 180. Attachment of stand blocks and branch pipes by welding