Indian Boiler Regulations, 2026
Chapter 5 — Valves, Gauges and Auxiliaries
62 regulations (181–242)Gazette starts p.622
Regulation headings are not yet verified against the official Gazette. Entries in [square brackets] are editorial navigation labels, not Gazette wording.
← Chapter 4: Fusion Welded Drums for Water Tube Boilers and Superheaters · Chapter 6: Boiler and Superheater Tubes, Headers and Other Parts →
- 181. Requisite Mountings, fittings and Auxiliaries
- 182. Additional Requirements for Automatic Boilers
- 183. Materials, Temperature and Pressure Limits
- 184. Castings
- 185. Packing of Cocks
- 186. Covers and Spindles
- 187. Direction of Operation
- 188. Moving Parts
- 189. Flanges
- 190. Valve Seatings
- 191. Chests and fittings in General
- 192. Special requirements for safety valves
- 193. ordinary Lift Safety Valve
- 194. High Lift Safety Valve
- 195. Full Lift Safety Valve
- 196. Discharge Capacity of Safety Valves
- 197. Over Pressure of Safety Valves
- 198. Pressure Drop (Blow Down)
- 199. Mountings of Safety Valves
- 200. Openings in Shell
- 201. Discharge Passage
- 202. Drainage
- 203. Moving Parts
- 204. Bearings for Levers
- 205. Attachments of Weights and Springs
- 206. Easing Gear
- 207. Lift
- 208. High and Low Water Alarms
- 209. Final Settings
- 210. Adjustment of Safety Valve Set Pressure
- 211. Change of Safety Valve Set Pressure
- 212. Materials
- 213. Dimensions
- 214. Determination of Maximum Allowable Working Pressure
- 215. Test
- 216. Extension Springs
- 217. Number of Effective Coils
- 218. Spacing of Coils
- 219. Finishing of Ends
- 220. Lever valves
- 221. Steam stop valve
- 222. Blow-down cock or valve and pipes
- 223. Blow-Down mountings
- 224. Blow-Down Valve or Cock
- 225. Water Gauges
- 226. Drains
- 227. Protectors
- 228. Glass Size
- 229. Safety Devices
- 230. Gauge Columns
- 231. Isolating Cocks
- 232. Pressure Gauges Dials
- 233. Connections
- 234. Gauge Cocks
- 235. Test Connections- Competent Person’s Pressure Gauge Attachment
- 236. Fusible Plugs
- 237. Type
- 238. Material
- 239. Attachment to Boiler
- 240. Feed Valves
- 241. Operating Position
- 242. Requirements as to Feed Apparatus in certain cases