Indian Boiler Regulations, 2026

Chapter 5 — Valves, Gauges and Auxiliaries

62 regulations (181–242)Gazette starts p.622

Regulation headings are not yet verified against the official Gazette. Entries in [square brackets] are editorial navigation labels, not Gazette wording.

← Chapter 4: Fusion Welded Drums for Water Tube Boilers and Superheaters · Chapter 6: Boiler and Superheater Tubes, Headers and Other Parts →

  1. 181. Requisite Mountings, fittings and Auxiliaries
  2. 182. Additional Requirements for Automatic Boilers
  3. 183. Materials, Temperature and Pressure Limits
  4. 184. Castings
  5. 185. Packing of Cocks
  6. 186. Covers and Spindles
  7. 187. Direction of Operation
  8. 188. Moving Parts
  9. 189. Flanges
  10. 190. Valve Seatings
  11. 191. Chests and fittings in General
  12. 192. Special requirements for safety valves
  13. 193. ordinary Lift Safety Valve
  14. 194. High Lift Safety Valve
  15. 195. Full Lift Safety Valve
  16. 196. Discharge Capacity of Safety Valves
  17. 197. Over Pressure of Safety Valves
  18. 198. Pressure Drop (Blow Down)
  19. 199. Mountings of Safety Valves
  20. 200. Openings in Shell
  21. 201. Discharge Passage
  22. 202. Drainage
  23. 203. Moving Parts
  24. 204. Bearings for Levers
  25. 205. Attachments of Weights and Springs
  26. 206. Easing Gear
  27. 207. Lift
  28. 208. High and Low Water Alarms
  29. 209. Final Settings
  30. 210. Adjustment of Safety Valve Set Pressure
  31. 211. Change of Safety Valve Set Pressure
  32. 212. Materials
  33. 213. Dimensions
  34. 214. Determination of Maximum Allowable Working Pressure
  35. 215. Test
  36. 216. Extension Springs
  37. 217. Number of Effective Coils
  38. 218. Spacing of Coils
  39. 219. Finishing of Ends
  40. 220. Lever valves
  41. 221. Steam stop valve
  42. 222. Blow-down cock or valve and pipes
  43. 223. Blow-Down mountings
  44. 224. Blow-Down Valve or Cock
  45. 225. Water Gauges
  46. 226. Drains
  47. 227. Protectors
  48. 228. Glass Size
  49. 229. Safety Devices
  50. 230. Gauge Columns
  51. 231. Isolating Cocks
  52. 232. Pressure Gauges Dials
  53. 233. Connections
  54. 234. Gauge Cocks
  55. 235. Test Connections- Competent Person’s Pressure Gauge Attachment
  56. 236. Fusible Plugs
  57. 237. Type
  58. 238. Material
  59. 239. Attachment to Boiler
  60. 240. Feed Valves
  61. 241. Operating Position
  62. 242. Requirements as to Feed Apparatus in certain cases