Regulation 218. Spacing of Coils

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 636

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

218. Spacing of Coils.─The space between the coils when the valve is lifted to 1/4th of its diameter, shall be not less than 1.6 mm for full lift valves and 0.8 mm for ordinary and high lift valves.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 218 sets the minimum gap between spring coils when the valve is lifted to 1/4th of its diameter: not less than 1.6 mm for full lift valves and 0.8 mm for ordinary and high lift valves.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
179Butt Straps and spacing of rivets below requirements77%Chapter IV (DPIIT scan), image 2
405Spacing of rows of rivets77%Chapter X (DPIIT scan), image 1
IBR 1950 regulation 179 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 179 page for its amendments.

Reg. 178, Reg. 179, Reg. 180, Reg. 181
SHELLS


When Pitch exceeds maximum allowed

Should the pitch of the rivets exceed the maximum pitch allowed, the permissible pitch shall be used in place of the actual pitch in determining the percentage of plate section. No greater percentage than 85 shall be allowed for any type of riveted joint.

Reg. 179
SHELLS


Butt Straps and spacing of rivets below requirements

Should the spacing of the rows of rivets or the distance between edge of plate and rivet hole or the thickness of butt straps be less than that specified in Regulations 182 and 184 the percentage representing the strength of joint shall be modified as prescribed in those regulations.

Reg. 180
SHELLS


Percentage of Welded and Strapped Seams

In determining the percentage of strength of a welded seam covered by a strap or straps the formulae and allowances in Regulations 177, 178 and 179 shall be applied, but 50 per cent shall be added to the rivet percentage for the weld.

Reg. 181
SHELLS


Percentage to be allowed for Solid Rolled Shells

When small shells are rolled from the solid, J, in equation (1) shall be taken as 100 per cent.
IBR 1950 regulation 405 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 405 page for its amendments.

Reg. 405, Reg. 406, Reg. 407

Spacing of rows of rivets

Spacing of rows of rivets and distance between rivet hole and edge of plate shall comply with Regulation 184.



Reg. 406

End and Circumferential Seams

End and Circumferential Seams shall comply with Regulation 104.



Reg. 407

Manholes and other openings in Shells

a)

 Uncompensated opening shall comply with Regulation 187.
b) Compensated opening shall comply with Regulations 170, 171 and 186.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
636
PDF page index
636 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 1384a60444ca7290
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 218, Regulation 218, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.636. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.