BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 5 · Valves, Gauges and Auxiliaries

Regulation 217. Number of Effective Coils

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 636Formula / symbols

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

217. Number of Effective Coils.─ The number of effective or free coils in a compression or extension spring shall be determined from the following formulae:

(i)For Round or Square wire

KCd4 Equation (5/15)

N =
SD3

(ii)For Rectangular Wire Equation (5/16)

66B3H3K
N =

(B2 + H2) SD2

Where,
N = Number of effective coils,
K = Compression or tension in inches at set pressure,
C = 22 for round, 30 for square steel,
d = diameter or side of square steel in 16th of an inch,
S = load on spring in lbs. at blow off pressure,
D = mean diameter of coil in inches,
B= breadth of wire in 16th of an inch,
H= Depth of wire in 16th of an inch.

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 217 gives the formulae for the number of effective (free) coils in a compression or extension spring.

Key points

  • (i) Round or square wire: Equation (5/15).
  • (ii) Rectangular wire: Equation (5/16).
  • Symbols: N is the number of effective coils, K the compression or tension in inches at set pressure, S the load on the spring in lbs at blow off pressure, and D the mean coil diameter in inches. C is 22 for round and 30 for square steel.

Watch out

  • Wire size d (and breadth B and depth H for rectangular wire) are in 16th of an inch, not inches.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
636
PDF page index
636 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 8781c254036782fb
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 217, Regulation 217, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.636. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.