Regulation 234. Gauge Cocks

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 639

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

234. Gauge Cocks.─ The handles of the gauge cocks shall be parallel to the pipes in which they are located when the cocks are open and marks shall be cut on the shank of the cock indicating open position.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 234 requires gauge cock handles to be parallel to the pipe when the cock is open, with marks cut on the shank of the cock to show the open position.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
329Gauge Cocks100%Chapter VI (DPIIT scan), image 8
325Gauge Columns75%Chapter VI (DPIIT scan), image 8
IBR 1950 regulation 329 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 329 page for its amendments.

Reg. 327, Reg. 328, Reg. 329
PRESSURE GAUGES

Dials

a) For pressure up to and including 35 kg/cm2, pressure gauge dial shall be graduated in kg/cm2 from zero to twice the pressure as nearly as may be practicable.
b) For pressure exceeding 35 kg/cm2 the range of the graduation shall be from zero to one and a half times the maximum permissible working pressure, as nearly as may be practicable, but in no case shall the maximum graduation on the gauge be less than 70 kg/cm2
c) The scale on the dial shall be clearly and permanent marked in kg/cm2.
d) The dial of each pressure gauge shall have to be marked upon it in red, the maximum permissible working pressure.
e) Where the gauge is compensated for a head of water between the gauge and the boiler connection, the amount of such compensation shall be marked on the dial. Pressure gauge shall be calibrated within an accuracy of ± 1%. Boiler pressure gauges shall not be less than 150 mm in diameter.
f) The travel of the pointer of the dial gauge shall not exceed 325o C.


Reg. 328

Connections

All pressure gauges shall be fitted with a syphon pipe and a cock or valve integral with, or adjacent to, the gauge in such manner that the gauge may be shut off and removed whilst the boiler is under steam.


Reg. 329

Gauge Cocks

The handles of the gauge cocks shall be parallel to the pipes in which they are located when the cocks are open and marks shall be cut on the shank of the cock indicating open position.
IBR 1950 regulation 325 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 325 page for its amendments.

Reg. 321, Reg. 322, Reg. 323, Reg. 324, Reg. 325, Reg. 326

Drains

A drain cock or valve with a suitable discharge pipe shall be fitted to each water gauge.


Reg. 322

Protectors

Where tubular glass water gauges are fitted, substantial protectors shall be provided. The glass shall be suitable treated to prevent splintering.


Reg. 323

Glass size

Tubular water gauge glasses shall be not less than ½ inch and not more than 3/4 inch outside diameter.


Reg. 324

Safety Devices


Water gauge glass mountings shall be fitted with self-closing devices in the bottom arm and it is recommended that a similar device should be fitted in the top arm.


Reg. 325

Gauge columns


Where the gauges are mounted on a column there shall be no connecting passage between the top and bottom arms of the column unless valves or cocks are fitted between the columns and the boiler.


Reg. 326

Isolating Cocks


Where isolating cocks or valves connecting water gauge pipes to the boiler are fitted, they shall be not less than 1 inch bore and of the bolted cover type with separate packing gland.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
639
PDF page index
639 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash fdd213ea5ba0e12b
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 234, Regulation 234, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.639. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.