BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 5 · Valves, Gauges and Auxiliaries

Regulation 235. Test Connections- Competent Person’s Pressure Gauge Attachment

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 639

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

235.Test Connections- Competent Person’s Pressure Gauge Attachment.─ (1)Every boiler shall be fitted with a valve or cock carrying in a vertical position a receiving screw for attachment of the Competent Person’s pressure gauge.

(2)The receiving socket shall be tapped for M/20 x 1.5 metric threads and shall be fitted with an easily removable cap.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 235 requires every boiler to have a fitting for attaching the Competent Person's pressure gauge (listed among the fittings in regulation 181).

Key points

  • (1) A valve or cock carrying, in a vertical position, a receiving screw for the Competent Person's pressure gauge.
  • (2) The receiving socket must be tapped for M/20 x 1.5 metric threads and fitted with an easily removable cap.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
639
PDF page index
639 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash b3c0dd47a5d18dce
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 235, Regulation 235, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.639. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.