Indian Boiler Regulations, 2026 · Chapter 5 · Valves, Gauges and Auxiliaries

Regulation 189. Flanges

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 626

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

189. Flanges.─(1) Flanges shall be in accordance with the tables for the appropriate pressure (Appendix-F).

(2)In the case of safety valves the drilling, thickness and bolting of inlet flanges shall be in accordance with tables for the appropriate pressure and material and for the diameter of flange adopted. In the case of outlet flanges the pressure taken shall be the pressure on the outlet side of the valve.

(3)For the purpose of determining particulars of flanges for blow down and scum pipe fittings, the design pressure of the fittings shall be assumed to be design pressure of the boiler.

(4)All flanges shall be machined on the face, spot faced, or machined at the back, and the bolt holes shall be drilled.

Referenced provisions

Appendix F

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 189 says how flanges on boiler fittings are to be sized, drilled and finished.

Key points

  • (1) Flanges must follow the tables for the appropriate pressure in Appendix-F.
  • (2) For safety valves, drilling, thickness and bolting of inlet flanges follow the tables for the appropriate pressure, material and flange diameter. For outlet flanges, use the pressure on the outlet side of the valve.
  • (3) For blow down and scum pipe fittings, the design pressure of the fittings is taken as the design pressure of the boiler when choosing flange particulars.
  • (4) All flanges must be machined on the face, and spot faced or machined at the back. Bolt holes must be drilled.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
358Flanges of copper pipes100%Chapter VIII (DPIIT scan), image 6
359Standard Flanges100%Chapter VIII (DPIIT scan), image 7
410Flanges100%Chapter X (DPIIT scan), image 4
IBR 1950 regulation 358 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 358 page for its amendments.

Reg. 358, Reg. 359

Flanges of copper pipes

Flanges of copper pipes may be made of bronze. When flanges are attached to copper pipes by brazing they shall be secured in such additional way (e.g. by riveting the ends or forming a conical end so as to fit into the conical bore in the flange) that the resistance to withdrawal from the flange does not depend wholly on the brazing.



Reg. 359

Standard Flanges

The size and thickness of flanges and the number and size of their bolts should be as the given values.
IBR 1950 regulation 359 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 359 page for its amendments.

Reg. 358, Reg. 359

Flanges of copper pipes

Flanges of copper pipes may be made of bronze. When flanges are attached to copper pipes by brazing they shall be secured in such additional way (e.g. by riveting the ends or forming a conical end so as to fit into the conical bore in the flange) that the resistance to withdrawal from the flange does not depend wholly on the brazing.



Reg. 359

Standard Flanges

The size and thickness of flanges and the number and size of their bolts should be as the given values.
IBR 1950 regulation 410 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 410 page for its amendments.

Reg. 410, Reg. 411, Reg. 412
RIVETED STEEL BOILERS

Flange-Thickness and Drilling

The thickness and drilling of flanges of standpipes shall be in accordance with the Appendix (E).



Reg. 411
RIVETED STEEL BOILERS

Pads

These shall comply with Regulation 155.



Reg. 412
RIVETED STEEL BOILERS

Unstayed Flat-End Plates

The working pressure of unstayed flat-end plates shall be determined by the following formula:

W.P. = 2S(t-2)² Eqn. (98)
D²

Where,

t = thickness of plate in thirty-seconds of an inch.
W.P. = Working pressure in pounds per square inch.
D = Diameter in inches of the pitch circle of the bolts or rivets when the plate is attached to an outside flange or the internal diameter of the shell when the plate is attached to an inside flange.
S = Minimum tensile stress of the plate in tons per square inch.

In no case shell the thickness of an unstayed flat-end plate be less than 3/8 inch.

Where an unstayed flat-end plate is pierced for electrodes or other fittings by openings having a diameter not greater than 2 ½ inches and the pitch of the openings in inches is not less than four times the diameter of the openings in inches, compensation is not required.

Where the diameter of the openings in an unstayed flat-end plate is greater than 2 ½ inches or the pitch in inches is less than four times the diameter of the openings, adequate compensation shall be provided in the manner described in Regulations 170, 171 and 186.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
626
PDF page index
626 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 8afcfd5b32e5a0ad
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 189, Regulation 189, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.626. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.