199. Mountings of Safety Valves.─(1)(a)Safety valves shall be mounted without any intervening valve on pads or branches used for no other purpose. The axis of the valve shall be vertical.
(b)The cross – sectional area of the bore of each pad or branch shall be at least equal to the area of the bore at the inlet of the safety valve, or where two or more safety valves are mounted on the same pad or branch, at least equal to the sum of the areas of the inlet bores of all the safety valves.
(2)(a) Branches shall be as short as possible so as not to impair proper action of the safety valves or impose any undue stress on the branches at their point of attachment to the boiler.
(b)Nothing shall obstruct free flow to the safety valve. Branches, particularly when full lift safety valves are mounted on them, should be radiused at the inlet.
(c)The inlet and outlet flanges shall be drilled in accordance with the approximate table in Appendix-F for the diameters of flanges adopted.
In short
Regulation 199 sets how safety valves are mounted on the boiler: on dedicated pads or branches, vertical, with no intervening valve and an unobstructed inlet.
Key points
- (1)(a) Mount safety valves without any intervening valve, on pads or branches used for no other purpose, with the valve axis vertical.
- (1)(b) The bore area of each pad or branch must be at least the inlet bore area of the safety valve. Where two or more valves share a pad or branch, it must be at least the sum of their inlet bore areas.
- (2)(a) Branches must be as short as possible, so they do not impair valve action or put undue stress on the attachment to the boiler.
- (2)(b) Nothing may obstruct free flow to the valve. Branches, particularly for full lift valves, should be radiused at the inlet.
- (2)(c) Inlet and outlet flanges are drilled to the table in Appendix-F for the flange diameter adopted.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 199, Regulation 199, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.631. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.