Indian Boiler Regulations, 2026 · Chapter 4 · Fusion Welded Drums for Water Tube Boilers and Superheaters
Regulation 171. Efficiency of ligament
Not yet checked against the official Gazette; verify before relying on it.
171.Efficiency of ligament.─ When a shell or drum is drilled for tubes in a line parallel to the axis of the shell or drum, the efficiency of the ligament between the tube holes shall be determined as follows:
(a)When a pitch of the tube holes on every row is equal (as in Fig. 4/8), the formula is:
p – d = efficiency of ligament Equation (4/3)
------
p
Where, pitch of tube holes, mm.
p = diameter of tube holes, mm.
d =
The pitch of tube holes shall be measured either on the flat plate before rolling or on the median
line after rolling.
Example: Pitch of tube holes in the drums as shown in Fig. 4/8 = 133.3 mm. Diameter of tube = 82.5 mm. Diameter of tube holes = 83.3 mm.
p – d 133.3 - 83.3 ------ = ---------------- = 0.375, efficiency of ligament. p 133.3
Fig. 4/8 – EXAMPLE OF TUBES SPACING WITH PITCH OF HOLES EQUAL IN EVERY ROW
(b)When the pitch of tube holes on any one row in unequal (as in Fig. 4/9 &4/10), the formula is:
p - nd -------- = efficiency of ligament Equation (4/4) p
Where, p = unit length of ligament, mm.
n = number of tube holes in length p.
d = diameter of tube holes, mm.
Example: Spacing shown in Fig. 4/9 Diameter of Tube hole = 83.3 mm
p – nd 304.8 – (2 x 83.3) ------ = ------------------- = 0.453, efficiency of ligament. p 304.8
FIG. 4/9 – EXAMPLE OF TUBES SPACING WITH PITCH OF HOLES UNEQUAL IN EVERY ROW
Example: Spacing shown in Fig. 4/10 Diameter of tube hole = 83.3 mm
p – nd 742.9 – (5 x 83.3) ------ = --------------------- = 0.439, efficiency of ligament. p 742.9
FIG. 4/10 – EXAMPLE OF TUBE SPACING WITH PITCH OF HOLES VARYING IN SECOND AND THIRD ROW
(c)The strength of those ligaments between the tube holes which are subjected to a longitudinal stress shall be at least one-half times the required strength of those ligaments which come between the tube holes which are subjected to a circumferential stress.
(d)(i) When bending stresses due to weight are negligible and the tube holes are arranged along a diagonal line with respect to the longitudinal axis, the efficiency (z) of corresponding ligaments is given in Fig. 4/11, with the ratio b/a on the abscissa and the ratio
2a – d d
------- or -- used as a parameter.
a
2a
Where, a and b are measured as shown in Figs. 4/13 and 4/14,
d = diameter of the tube holes.
Notes: 1. The dimension should be measured either on the flat plate before rolling or on the medium line after rolling.
2. The data given on Fig. 4/11 are based on the following formulae:
2
Z =
A+B+√(A-B)2+4C2
Where, cos2α+1
A= 2 x (1- d cos α)
a
B= (1) x (1- d cos α) (sin2α+1)
2 a cosα sinα
C= 2 x (1- d cosα)
a cosα= 1 ; sinα= 1
2 √1+ 2 a2
b
√1+ b
a2
(α = angle of centre line of cylinder to centre line of diagonal holes).
(ii)The same rule as in paragraph (i) should apply for the case of drilling holes to a regular saw- tooth shown in Fig. 4/15.
(iii)In the case of a regular staggered spacing of tube holes (see Fig. 4/13, the smallest value of the efficiency z of all the ligaments, longitudinal, circumferential and diagonal, is given in Fig. 4/12 by the ratio Pc/PL on the abscissa, and the ratio
PL – d d
------- or -- used as a parameter.
a
PL
Where, d = diameter of tube holes, mm.
Pc = 2b = twice the distance between circumferential rows of holes;
PL = 2a = twice the distance between axial row holes;
Note: The dimension Pc should be measured on the flat plate before rolling or on the medium line after rolling. The data on Fig. 4/12 are based on the same formulae as shown in Fig. 4/13.
(e)When holes spaced longitudinally along a drum are hot in a straight line, the equivalent longitudinal pitch for each spacing may be used in the application of the above rules. The equivalent pitch is obtained by multi plying the actual longitudinal pitch by the equivalent efficiency obtained from
Fig. 4/11 for each spacing.
Parts of this extracted text look garbled; read the Gazette page before using any value.
Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
Drum shell calculator, ligament efficiency per this regulation
Figures cited in this regulation (8, exact crops of the Gazette)

View Gazette page 602 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 602 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 603 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)

View Gazette page 605 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 606 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 607 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 607 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)

View Gazette page 607 · figure catalogue
Auto-traced outline: SVG · DXF (not to scale, may copy print defects)
In short
Regulation 171 sets how to calculate the efficiency of ligaments between tube holes drilled in a shell or drum.
Key points
- (a) Equal pitch in every row: efficiency = (p − d)/p, with p the pitch and d the hole diameter (Equation 4/3). Pitch is measured on the flat plate before rolling or on the median line after rolling.
- (b) Unequal pitch in a row: efficiency = (p − nd)/p, where p is a unit length of ligament and n the number of holes in it (Equation 4/4).
- Worked examples are given for Figs. 4/8, 4/9 and 4/10 in the Official text tab.
- (c) Ligaments under longitudinal stress must have at least one-half the required strength of ligaments under circumferential stress.
- (d) For diagonal hole patterns (where bending from weight is negligible), regular saw-tooth patterns and regular staggered spacing, efficiency z is read from Figs. 4/11 and 4/12, which are based on the formulae given in the Notes.
- (e) Where longitudinal holes are not in a straight line, an equivalent longitudinal pitch may be used, found by multiplying the actual pitch by the equivalent efficiency from Fig. 4/11.
Watch out
- The formula and symbol layout in the extracted text is broken in places. Check the Gazette page for the exact formulae.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.




Indian Boiler Regulations, 2026, reg. 171, Regulation 171, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.601–604. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.