BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)

Regulation 8 — Use of Welding

Unofficial DPIIT web edition · not verified2 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine). The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette
Reg. 8
Welding:-

(a) The use of welding in the construction of boilers shall be permitted only where specifically provided for in the standard conditions.

Earlier text: the 2008 DIPP web edition

Welding:-

(a)The use of welding in the construction of boilers shall be permitted only where specifically provided for in the standard conditions.

(b)Notwithstanding anything contained in Regulation 7 hollow forged or fusion welded drums and shells shall be constructed under the supervision of an Inspecting Authority and shall not be accepted unless the certificates required under Regulation 4 are submitted.

Amendments found

Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.

DateNotificationPartActionWhat changed (summary)Web edition
1969-03-01/1988-12-31compilation-1969-1988#p11 OCR of compilation(b)OmittedDeletes the Note in clause (b).listed before the capture
1999-04-19G.S.R. 139 OCR of scan(b)OmittedOmits sub-regulation (b) and the note under it.listed before the capture

Possible IBR 2026 successors (heading match, unverified): Reg. 57, Reg. 71, Reg. 72, Reg. 73, Reg. 74, Reg. 145, Reg. 148, Reg. 180, Reg. 273, Reg. 318, Reg. 331, Reg. 399, Reg. 432, Reg. 507, Reg. 510, Reg. 511, Reg. 512, Reg. 513, Reg. 520, Reg. 521, Reg. 524, Reg. 525, Reg. 527, Reg. 537, Reg. 543, Reg. 563