96. Furnaces of vertical boilers.─ (1) The furnaces of vertical boilers may be constructed in one or more lengthwise sections, each section being rolled from one plate to a full circle. In such cases, the component sections may be jointed circumferentially by electrically butt welding and shall be stress relieved in accordance with regulation 123.
(2)In the case of vertical boilers where tube plates form part of the firebox, the tube plate portion may be constructed in two vertical sections and the vertical seams when welded shall be stress relieved. The maximum permissible variation in diameter, at any cross-section shall not exceed 6 mm for fireboxes up to 900 mm in diameter, or 10 mm for fireboxes over 900 mm in diameter, or half the thickness of the plate whichever is greater.
(3)Circular furnaces shall preferably be tapered, a tapper of 38 mm in diameter per 300 mm of height being recommended. The minimum water space at the bottom between the furnaces and the shell shall not be less than 50 mm for boilers up to 760 mm in diameter and shall be not less than 63 mm for boilers over 760 mm diameter.
(4)The method of welding shall be in accordance with regulation 151. Flats formed in the firebox for the insertion of water tubes shall have ample radius at the junction of the flat and the curved surfaces and shall be free from sharp corners or tool marks. The plate shall not be unduly thinned.
(5)Ogee flanging where integral with the firebox or in a separate ring shall preferably be formed in one heat by suitable machinery and shall be allowed to cool gradually to avoid internal stresses. Rings of fire holes mouthpieces or foundation rings shall be made of mild steel. Z sections shall not be used for foundation rings.
(6)Furnaces of vertical type boilers may be attached to the shell at the fire hole by a circular ring of substantial section fusion welded to shell and firebox. The opening in the shell for fire hole shall be substantially compensated by a ring welded on the outside of the shell plate.
(7)At the fire hole the firebox plate and the shell plate may be flanged and fusion welded together.
In short
Regulation 96 sets construction rules for the furnaces of vertical boilers: sections and welds, circularity, taper, water space and fire hole attachments.
Key points
- (1) Furnaces may be in one or more lengthwise sections, each rolled from one plate. Sections may be joined circumferentially by electric butt welding and stress relieved under regulation 123.
- (2) Where tube plates form part of the firebox, that portion may be in two vertical sections, with welded seams stress relieved. The diameter variation limit is 6 mm for fireboxes up to 900 mm diameter, 10 mm over 900 mm, or half the plate thickness, whichever is greater.
- (3) Circular furnaces are preferably tapered, with 38 mm in diameter per 300 mm of height recommended. Minimum bottom water space between furnace and shell: 50 mm for boilers up to 760 mm diameter, 63 mm for larger boilers.
- (4) Welding follows regulation 151. Flats for water tubes need ample radius, no sharp corners or tool marks, and no undue thinning.
- (5) Ogee flanging is preferably formed in one heat and cooled gradually. Fire hole rings, mouthpieces and foundation rings are mild steel.
- (6), (7) The furnace may be attached at the fire hole by a welded ring, with the shell opening compensated by an external ring. Alternatively, firebox and shell plates may be flanged and fusion welded together.
Watch out
- Z sections must not be used for foundation rings.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 596 | Foundations of Vertical Boiler Furnaces | 84% | Chapter XII (DPIIT scan), image 14 |
| 122 | Furnaces of Horizontal Boilers | 83% | Chapter III (DPIIT scan), image 3 |
| 221 | Corrugated Furnaces of Horizontal Boilers | 81% | Chapter IV (DPIIT scan), image 14 |
IBR 1950 regulation 596 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 596 page for its amendments.
| Reg. 596, Reg. 597 | ||||||||||||||||||
Reg. 597 Foundations of Loco-type Boiler Fireboxes
| ||||||||||||||||||
IBR 1950 regulation 122 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 122 page for its amendments.
| Reg. 122 FURNACES Furnaces of Horizontal boilers
|
IBR 1950 regulation 221 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 221 page for its amendments.
| Reg. 220, Reg. 221, Reg. 222 FURNACES Plain Furnaces of Horizontal Boilers For plain furnaces or furnaces strengthened by Adamson or other joints or stiffeners of sufficient strength and for the semi-cylindrical tops of fire-boxes and bottom of combustion chambers where the sides are securely stayed, the working pressure shall not exceed the smaller of the values obtained from the following formulae :-
Where d = the external diameter of the furnace or chamber top or bottom in inches t = the thickness of the furnace plate in 32nds of an inch. L = the length of the furnace or other part in inches measured between points of substantial support, i.e. centres of rows of rivets in end seams or commencement of curvature of flange, whichever is applicable. C = 1450 where the longitudinal seams of steel furnaces are welded and 1300 where they are riveted, C = 725 where the longitudinal seams of circular copper fireboxes or furnaces are fitted with double butt straps and 650 where they are lapped, C1 = 50 where the longitudinal seams of steel furnaces are welded and 45 where they are riveted, C1 = 25 where the longitudinal seams of circular copper fireboxes or furnaces are fitted with double butt straps and 22.5 where they are lapped. Reg. 221 FURNACES Corrugated Furnaces of Horizontal Boilers The maximum working pressure to be allowed on corrugated furnaces shall be determined by the following formula -
where D is the least external diameter in inches measured at the bottom of the corrugations on the water side. t is the thickness of the furnace plate in 32nds of an inch measured at the bottom of the corrugation or chamber, C = 480 for the Fox, Morrison, Deighton, Purves,, and other similar furnaces and 510 for the leeds Forge Bulb Suspension Furnace. Reg. 222 FURNACES Plain Furnaces of Vertical Boilers The same formulae as for the plain furnaces of horizontal boilers shall be used, but where the furnaces are tapered the diameter to be taken for calculation purposes shall be the mean of that at the top and of that at the bottom where it meets the substantial support from flange or ring. The length for the same purpose shall be the distance from the centre of the row of rivets connecting the crown and the body of the furnace to the substantial support at the bottom of the furnace, or to a row of screwed stays connecting the furnace to the shell, provided that the pitch of stays at the furnace does not exceed 14 times the thickness of the furnace plate when the stays are riveted at their ends or 16 times when the stays are fitted with nuts. Such screwed stays shall be in diameter over the threads not less than twice the thickness of the furnace plate and in no case less than 3/4" diameter {See Reg.135 (d)}. |
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 96, Regulation 96, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.564–565. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.