Indian Boiler Regulations, 2026 · Chapter 3 · Construction and Workmanship
Regulation 100. Uptakes
Not yet checked against the official Gazette; verify before relying on it.
100. Uptakes.─ (1) The uptakes shall be formed from seamless steel pipes or from plate or strip rolled and electric resistance welded or fusion butt welded into pipes by electric arc process. The tolerances on these pipes shall comply with the requirements of regulation 251.
(2)The uptake shall be fusion butt welded by the electric arc process to the upward flange of the opening in the firebox crown plate provided the conditions for fusion welding given in regulation 97 are observed. The edges of the upward flange and the adjacent end of the uptake shall be bevelled in accordance Fig. 3/3 or Fig.3/4. The depth of the crown plate opening from the commencement of the curvature of the flanging radius shall be not less than twice the plate thickness with a minimum of 25 mm. On completion of welding the uptake and crown plate shall be effectively stress relieved by heat treatment.
(3)Where the firebox crown plate is also fusion welded to the body of the firebox, the firebox complete with uptake shall be effectively stress relieved by heat treatment on completion of the welding.
(4)Welded uptakes shall be so arranged that the weld is directly facing the longitudinal centre line of the manhole.
Figures cited in this regulation (1, exact crops of the Gazette)

View Gazette page 565 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
In short
Regulation 100 sets how uptakes are made and welded to the firebox crown plate, and the stress relief that follows.
Key points
- (1) Uptakes are seamless steel pipe, or plate or strip rolled and electric resistance or fusion butt welded by electric arc. Tolerances follow regulation 251.
- (2) The uptake is fusion butt welded by electric arc to the upward flange of the crown plate opening, under regulation 97, with edges bevelled to Fig. 3/3 or Fig. 3/4. The opening depth from where the flanging radius starts is at least twice the plate thickness, with a minimum of 25 mm. The uptake and crown plate are then stress relieved.
- (3) Where the crown plate is also welded to the firebox body, the complete firebox with uptake is stress relieved after welding.
- (4) The weld of a welded uptake faces the longitudinal centre line of the manhole.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 100, Regulation 100, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.566. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.