Indian Boiler Regulations, 2026 · Chapter 3 · Construction and Workmanship

Regulation 82. Circumferential and end seams

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 561

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

82. Circumferential and end seams.─ Joint efficiency of circumferential seams shall be determined as detailed in sub-regulation (1) of regulation 169. In the event of tube holes forming a ligament at the location of circumferential seams, the joint efficiency shall be calculated as per regulation 171.

Referenced provisions

Reg. 169 · Reg. 171

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 82 says the joint efficiency of circumferential seams is found using sub-regulation (1) of regulation 169. Where tube holes form a ligament at a circumferential seam, the joint efficiency is calculated under regulation 171.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
406End and Circumferential Seams100%Chapter X (DPIIT scan), image 1
IBR 1950 regulation 406 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 406 page for its amendments.

Reg. 405, Reg. 406, Reg. 407

Spacing of rows of rivets

Spacing of rows of rivets and distance between rivet hole and edge of plate shall comply with Regulation 184.



Reg. 406

End and Circumferential Seams

End and Circumferential Seams shall comply with Regulation 104.



Reg. 407

Manholes and other openings in Shells

a)

 Uncompensated opening shall comply with Regulation 187.
b) Compensated opening shall comply with Regulations 170, 171 and 186.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
561
PDF page index
561 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash c76f1a36cc1b0ebf
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 82, Regulation 82, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.561. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.