Indian Boiler Regulations, 2026 · Chapter 3 · Construction and Workmanship
Regulation 140. Compensation rings to manholes
Not yet checked against the official Gazette; verify before relying on it.
140. Compensation rings to manholes.─ Compensation shall be provided in every case for the part cut of a cylindrical shell for a manhole. The strength of the net section of compensating ring and also welds securing them to the shell, compared with that part of the shell cut out, shall not be less than the efficiency of the longitudinal seam.
In short
Every manhole cut in a cylindrical shell must be compensated. The strength of the net section of the compensating ring, and of the welds securing it, compared with the part of the shell cut out, must be at least the efficiency of the longitudinal seam.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 140, Regulation 140, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.585. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.