Indian Boiler Regulations, 2026 · Chapter 3 · Construction and Workmanship
Regulation 125. Headers, mud boxes, etc. of water tube boilers
Not yet checked against the official Gazette; verify before relying on it.
125. Headers, mud boxes, etc. of water tube boilers.─(1) (a) Headers and mud boxes, etc. of water tube Boiler may be of seamless or welded steel or of cast steel complying with the requirements of the provisions contained in regulations 49 to 57. Where welded, the welding shall be stress relieved, radio graphed or ultrasonically examined and in all respects shall be to the satisfaction of the Inspecting Authority as per Table 3/5 of regulation
123.
(b)Open ends of seamless steel tube headers may be closed by forging or the ends may be secured by bolting, screwing or welding in an approved manner. Bolting shall not be used where the bolts are exposed to or are swept by gases of combustion.
(c)The method of attachment of the ends shall be subject to the ends shall be subject to the approval of the Inspecting Authority.
(2)Each piece prior to being fitted in place shall be subjected to hydraulic tests to one-and-a-half times the design pressure of the boiler into which it is to be fitted.
(3)(a) The sighting hold doors and header caps shall be substantial and be capable of being removed or replaced from time to time without loss of efficiency of safety. They may be held in position either by means of bolts or by seal welding.
(b)The bolts by which they are held in place shall be fitted to them in such a way as to satisfy the above conditions.
(c)The doors shall be so designed that they will not blow out in the event of breakage of the bolt.
(d)Circular holes also may be provided in addition to elliptical holes, if provision is made to prevent the door bolts from turning, while securing the joint.
(4)All flanges shall have a fillet with a radius of curvature at least equal to the thickness of the necks to which they are attached.
Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.
In short
Regulation 125 covers headers, mud boxes and similar parts of water tube boilers: material, welding, end closures, hydraulic testing, doors and caps, and flange fillets.
Key points
- (1)(a) They may be seamless or welded steel, or cast steel meeting regulations 49 to 57. Welds must be stress relieved, radiographed or ultrasonically examined, to the Inspecting Authority's satisfaction as per Table 3/5 of regulation 123.
- (1)(b)–(c) Open ends of seamless tube headers may be closed by forging, or by bolting, screwing or welding in an approved manner. The method of attaching ends needs Inspecting Authority approval.
- (2) Each piece must be hydraulically tested to one-and-a-half times the design pressure of its boiler before being fitted.
- (3) Sighting hole doors and header caps must be substantial and removable without loss of efficiency or safety, held by bolts or seal welding. Doors must not blow out if a bolt breaks. Circular holes may be used as well as elliptical ones if door bolts are prevented from turning.
- (4) All flanges need a fillet radius at least equal to the thickness of the neck they are attached to.
Watch out
- Bolting must not be used for header ends where the bolts are exposed to or swept by combustion gases.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 125, Regulation 125, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.580. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.