Regulation 98. Furnace crown

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 565Figure referenced

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

98. Furnace crown.─ (1) The furnace crown shall be made from one plate and the seam connecting it to the furnace shall not fall in line with any circumferential seam of the boiler shell.

(2)The furnace crown may be welded to the vertical portion of the firebox. The joint shall be fusion butt welded by the electric arc process, provided the conditions for fusion welding under regulation 97 are observed. Where the joint is to be welded, the edges of the furnace crown and the firebox body shall be bevelled in accordance with Fig. 3/3 or Fig. 3/4. The depth of the flange of the furnace crown plate from the commencement of the curvature of the flanging radius shall be not less than four times the plate thickness with a minimum of 38 mm. On completion of welding the firebox shall be effectively stress relieved by heat treatment (also refer regulation 100).

Referenced provisions

Reg. 97 · Reg. 100

Figures cited in this regulation (1, exact crops of the Gazette)

Gazette Fig. 3/3
Fig. 3/3(no caption printed with this figure)
View Gazette page 565 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 98 covers the furnace crown of vertical boilers: one-plate construction, seam position and welding to the firebox.

Key points

  • (1) The furnace crown is made from one plate. Its seam to the furnace must not line up with any circumferential seam of the shell.
  • (2) The crown may be fusion butt welded to the vertical part of the firebox by electric arc, under the conditions of regulation 97, with edges bevelled to Fig. 3/3 or Fig. 3/4.
  • The flange depth, measured from where the flanging radius starts, is at least four times the plate thickness, with a minimum of 38 mm.
  • After welding, the firebox is stress relieved by heat treatment (see also regulation 100).

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
126Furnace Crown100%Chapter III (DPIIT scan), image 4
141Breathing d furnace Conner a the table below are re70%Chapter III (DPIIT scan), image 7
IBR 1950 regulation 126 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 126 page for its amendments.

Reg. 126
FURNACES
Furnace Crown

a)

The furnace crown shall be made from one plate and the seam connecting it to the furnace shall not fall in line with any circumferential seam of the boiler shell.

b) The furnace crown may be riveted to the vertical portion of the firebox, or alternatively, the joint may be fusion butt welded by the electric arc process, provided the conditions as to fusion welding in Regulation 125 are observed. Where the joint is to be welded the edges of the furnace crown and the firebox body shall be beveled in accordance with Fig. 3 or Fig. 4. The depth of the flange of the furnace crown plate from the commencement of the curvature of the flanging radius shall be not less than four times the plate thickness with a minimum of 1½ inches. On completion of welding the firebox shall be effectively stress relieved by heat treatment (see also Reg. 128).
IBR 1950 regulation 141 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 141 page for its amendments.

Reg. 141
GIRDER STAYS
Breathing Space

a) Gusset stays shall be so arranged as to allow sufficient breathing space around furnace connections and tube nests.
b) For Lancashire boilers the proportions shown in the table below are recommended for the portion of the end plates above the furnaces and flues.

Thickness of End Plates L-
(Fig.8)
L-
(Fig.9)
Inches Inches Inches
½ 9 10
9/16 10 10
5/8 11 12
11/16
¾
13/16
12 13
Above 13/16 12½ 13½
c) Fig. 8 shows the breathing space recommended for the following conditions: Flat end, furnace or flues flanged for attachment to end plate, furnaces and flues formed with Adamson flanged seams.
d) Fig. 9 shows similar conditions to Fig. 8 except that the end plate is flanged outwards for the furnace or flue ring connection, the breathing spaces allowed being 1 inch more than those for the same thickness of plate in Fig.8.
e) Where a corrugated section not less than 6 feet long is included in each internal flue of a Lancashire boiler, the dimensions given in the table above may be reduced by approximately 1½ inches throughout.
f) It is recommended that the breathing space below the furnaces and flues shall be approximately one half the dimensions given in the table above. Whereas it is desired to use any other arrangement which gives a greater or less degree of flexibility, the amount of breathing space shall be specially considered and modified as the necessity of the case requires.
g) For gusset stays above tube nests, as fitted in waste heat boilers without internal furnaces, a breathing space of 8 inches from the centre line of the top tubes to the centre of the toe rivets of the gusset angles is recommended (see Fig. 9).

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
565
PDF page index
565 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 899d440a1b9c492c
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 98, Regulation 98, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.565. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.