Regulation 136. Compensating rings and frames for openings in shells

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 583

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

136. Compensating rings and frames for openings in shells.─ (1) Compensating rings and frames for openings in shells shall be of same material as that of shell. The compensation provided shall preferably be flanged frames, which shall be fitted in all cases where the shell plate exceeds 14 mm thick. Flanged frames shall be weld-less and shall be flanged or pressed to provide a flat jointing surface for the cover.

(2)All compensating rings and frames shall be formed to bed closely to the surfaces to be connected. Any weld therein shall be on the transverse centre line.

(3)The flat jointing surfaces of all flanged or pressed frames and all doors or covers shall be machined.

Independent explanation — not the law · draft · engineer review in progress

In short

Compensating rings and frames for shell openings must be the same material as the shell and must bed closely to the surfaces they join.

Key points

  • (1) Flanged frames are preferred and are required where the shell plate exceeds 14 mm thick. Flanged frames must be weld-less and flanged or pressed to give a flat jointing surface for the cover.
  • (2) Any weld in a ring or frame must be on the transverse centre line.
  • (3) Flat jointing surfaces of frames, doors and covers must be machined.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
564Shells100%Chapter XII (DPIIT scan), image 2
297Openings in Shell79%Chapter VI (DPIIT scan), image 4
427Manholes and other openings in Shells75%Chapter X (DPIIT scan), image 8

Amendment history of the candidate IBR 1950 regulations: Reg. 564 (1 amendment)

IBR 1950 regulation 564 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 564 page for its amendments.

Reg. 563, Reg. 564

Classification of Fusion-Welded Boilers

The boilers covered by this Chapter shall be classified in accordance with Table XII/3.

TABLE XII/3

Classification of Fusion-Welded Boilers
Classification Limits of application Minimum thickness
Class I No. limit ¼ inch.
Class II When the following limits are not exceed:

(a) Working pressure105 pounds per sq. in.
(b) Working pressure in pounds per sq. in. multiplied by internal diameter in inches = 5250


Boilers up to and including 36 inches internal diameter-5/16 inch.
Class III When the following limits are not exceeded:

(a) Working presure 30 lbs. per sq. in.
(b) Working pressure multiplied by internal diameter in inches = 3000.
Boiler over 36 inches internal diameter-3/8 inch.


Reg. 564

Shells

a)

The working pressure of cylindrical shells for class I boilers shall be determined in accordance with regulations 270 and 271.
b) The working pressure of cylindrical shells for Class II and Class III boilers shall be determined by the following formula:-

WP = (t – 1.5)SC Equation XII/1
0.7 D

Where,

t is minimum thickness of shell plate in mm.
WP is working pressure in kg/cm².
D is maximum internal diameter in mm.
S is minimum tensile strength of plate in kg/mm².
C is a constant, as given below.

In no case, however, shall the factor of safety of the shell be less than 4 or the plate thickness be less than specified in Table XII/3 given under Regulation 563.

C=27 where Class II requirements are complied with.
C=23 for Class III boilers when stress relieved.
C=21 for Class III boilers when not stress relieved.

Where boilers have a nest or nests of horizontal tubes, so that there is a direct tension on the tube plates due to the vertical load on the boiler ends or to tube plates acting as horizontal ties across the shell:

i) each alternate tube in the outer vertical row of tubes shall be a stay tube.
ii) The thickness of tube plates and the spacing of the tubes shall be such that the section of metal taking the load is sufficient to keep the stress within that allowed on the shell plate, as determined by the following formula:-

WP = (t – 2) SJ Equation XII/2
2D

Where,

t is the thickness of the tube plate in mm.
WP is the working pressure in kg/cm².
S is the minimum tensile strength in kg/mm².
D is twice the radial distance of the centre of the outer row of tube holes from the axis of the shell in mm.
J is the percentage strength of the plate through the tube holes,

i.e. = 100 (P-D) Eqn. XII/3
P

P is the vertical pitch of tubes in mm.
D is the diameter of the tube holes in mm.

NOTE:- The tube plates between the stay tubes shall comply with the requirements for tubes plates (Regulation 577).
IBR 1950 regulation 297 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 297 page for its amendments.

Reg. 297, Reg. 298, Reg. 299

Opening in Shell

No accessories other than those integral with the Safety Valve shall obstruct the openings in the boiler shell. Discharging steam shall have direct access to the safety valve without flowing through internal pipes.


Reg. 298

Discharge Passage

The safety valve discharge pipes shall comply with the requirements of clauses (a) and (b) of this regulation. The discharge pipe shall be as short and straight as possible and be fitted with open drain to prevent accumulation water in the pipe. Suitable arrangement shall be provided in the discharge pipe system so that the discharge can readily be heard by the Boiler Attendant.

a) Steam safety valves: -

(i) Ordinary and high lift valves. Where a waste steam-pipe is fitted the pipe and the passage leading to it shall have a cross-sectional area not less than the minimum combined area of the safety valves required by Regulation 293.
(ii) Full lift valves. For full lift valves the area of waste steam-pipe and passages leading to it shall have a cross-sectional area not less than twice A, or such area above this minimum as may be required for valves having a higher approved constant, where A,E and P are as defined in regulation 293.
b) Economiser safety valves. The area of the discharge pipe from an economiser safety valve shall be at least twice the area of the valve seating. Where the discharge from several economiser safety valves is connected to the main discharge pipe, the diameter of the main discharge pipe shall be designed to prevent accumulation of pressure due to the formation of steam under the particular conditions of temperature and pressure which may be applicable.


Reg. 299

Drainage

For each enclosed safety valve chest a means of draining shall be provided. The drain pipe shall be laid with a continuous downward gradient clear of the boiler to a place where the discharge is visible and cannot do injury to any person.
IBR 1950 regulation 427 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 427 page for its amendments.

Reg. 427, Reg. 428, Reg. 429, Reg. 430
TESTS FOR CLASS II FUSION WELDED SEAMS

Manholes and other openings in Shells

Manholes and other openings in boiler shells shall be placed away from any welded seam. Oval openings shall be arranged with their minor axis parallel to the longitudinal centre line of the boiler.

(a) Un-compensated openings shall comply with Regulation 187.
(b) Compensated openings shall comply with Regulations 170, 171, 186 and 279.


Reg. 428
TESTS FOR CLASS II FUSION WELDED SEAMS

Dished End Plates with pressure on Concave side

This shall comply with Regulation 408.



Reg. 429
TESTS FOR CLASS II FUSION WELDED SEAMS

Unstayed Flat End Plates

The working pressure of unstayed flat end plates shall comply with Regulation 412.

Where the diameter of the openings in an unstayed flat end plate is greater than 2½ inches or the pitch in inches is less than four times the diameter of the holes full compensation shall be provided as in Regulation 279.



Reg. 430
TESTS FOR CLASS II FUSION WELDED SEAMS

Thickness of Angle Rings

Thickness of angle rings shall comply with Regulation 379(a).

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
583
PDF page index
583 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 11e6fb6304f58bc2
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 136, Regulation 136, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.583. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.