Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 427 — Manholes and other openings in Shells
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 428, 429, 430. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 427, Reg. 428, Reg. 429, Reg. 430
Reg. 428
Reg. 429
Reg. 430
|
Earlier text: the 2008 DIPP web edition
TESTS FOR CLASS II FUSION WELDED SEAMS
Manholes and other openings in Shells
Manholes and other openings in boiler shells shall be placed away from any welded seam. Oval openings shall be arranged with their minor axis parallel to the longitudinal centre line of the boiler.
(a)Un-compensated openings shall comply with Regulation 187.
(b)Compensated openings shall comply with Regulations 170, 171, 186 and 279.
Possible IBR 2026 successors (heading match, unverified): Reg. 136, Reg. 200, Reg. 348, Reg. 355, Reg. 455, Reg. 462, Reg. 566