BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)

Regulation 187 — Uncompensated holes in Water Tube Boilers

Unofficial DPIIT web edition · not verified2 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine). The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette
Reg. 187
SHELLS


Uncompensated holes in Water Tube Boilers

The maximum diameter of any unreinforced opening shall not exceed 'd' as shown in Figures 9B and 9C subject to a maximum of 203 millimetres.

The notations are as follows :


  K =    P x D  Eqn. 20
  1.82 fe


where,-

P = working pressure;

d = maximum allowable diameter of opening (in the case of an

opening of elliptical or round form, the mean value of the

two axes of the opening shall be taken for d);

D = outer diameter of the shell;

e = actual thickness of the shell;

f = allowable stress;

When K has a value of unity or greater, the maximum size of an unreinforced opening should be 51 millimetres (2 inches).

Earlier text: the 2008 DIPP web edition

SHELLS

Uncompensated holes in Water Tube Boilers

The maximum diameter of any unreinforced opening shall not exceed 'd' as shown in Figures 9B and 9C subject to a maximum of 203 millimetres.

The notations are as follows :

K =   P x D
                 Eqn. 20
      1.82 fe

where,-

P = working pressure;

d = maximum allowable diameter of opening (in the case of an

opening of elliptical or round form, the mean value of the

two axes of the opening shall be taken for d);

D = outer diameter of the shell;

e = actual thickness of the shell;

f = allowable stress;

When K has a value of unity or greater, the maximum size of an unreinforced opening should be 51 millimetres (2 inches).

Amendments found

Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.

DateNotificationPartActionWhat changed (summary)Web edition
1995-02-14G.S.R. 83 OCR of scanSubstitutedReplaces regulation 187 on uncompensated holes in water tube boilers, limiting unreinforced openings per Figures 9B and 9C to 203 mm.listed before the capture
2015-04-15G.S.R. 286(E)AmendedRedefines f as the maximum permissible stress from the governing code of the material.listed before the capture