Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 429 — Unstayed Flat End Plates
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 427, 428, 430. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 427, Reg. 428, Reg. 429, Reg. 430
Reg. 428
Reg. 429
Reg. 430
|
Earlier text: the 2008 DIPP web edition
TESTS FOR CLASS II FUSION WELDED SEAMS
Unstayed Flat End Plates
The working pressure of unstayed flat end plates shall comply with Regulation 412.
Where the diameter of the openings in an unstayed flat end plate is greater than 2½ inches or the pitch in inches is less than four times the diameter of the holes full compensation shall be provided as in Regulation 279.
Possible IBR 2026 successors (heading match, unverified): Reg. 86, Reg. 568