Regulation 117. Fitting of plain tubes

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 570

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

117. Fitting of plain tubes.─(1) Plain tubes shall be expanded at both ends. The expanding shall be parallel throughout the full thickness of the tube plate. Plain tubes may also be bell-mouthed, beaded, or welded at the gas inlet end.

(2)Where stay tubes are not fitted, the ends of the tubes shall be beaded over at the fire box end and beaded or bell-mouthed at the other end. If bell-mouthed, the tubes shall protrude not less than 13 mm beyond the tube plate.

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 117 sets how plain tubes are fixed in tube plates.

Key points

  • (1) Plain tubes are expanded at both ends, with the expansion parallel through the full tube plate thickness. They may also be bell-mouthed, beaded or welded at the gas inlet end.
  • (2) Where stay tubes are not fitted, tube ends are beaded over at the firebox end and beaded or bell-mouthed at the other. Bell-mouthed tubes protrude at least 13 mm beyond the tube plate.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
631Tubes100%Chapter XV (DPIIT scan), image 3
212Holding power of plain tubes78%Chapter IV (DPIIT scan), image 9
580Pitch of tubes73%Chapter XII (DPIIT scan), image 9
IBR 1950 regulation 212 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 212 page for its amendments.

Reg. 210, Reg. 211, Reg. 212
TUBE PLATES


Parts to be stayed

a) The stiffness of tube plates and pitch of stays within the nests of tubes where stay tubes are required and where marginal stay tubes are required in support of blank spaces adjacent to or between the nests shall be determined by flat plate rules under Regulation 195.
b) Tubes plates within the nests of tubes whether fitted with stay tubes or not shall comply with the requirements of Regulation 211 in regard to thickness and cross section between tubes.


Reg. 211
TUBE PLATES


Minimum thickness and cross-section

To provide a secure attachment for plain tubes in the tube plates the thickness and cross-section of the plate between the tube holes shall be not less than :-

Steel tube plate

.125D + .2 = minimum thickness in inches Eqn.(47)

.17 + .025 = minimum cross section in square inches Eqn.(48)

Copper tube plate,

.2D + .4 = minimum thickness in inches Eqn.(49)

.527D - .263 = minimum cross section in square inches Eqn.(50)

D is the diameter in inches of the tube at the part of attachment to tube plate.

Where the thickness and cross-section of the tube plates are less than the minimum the appropriate co-efficient in Eqn.(51) shall be reduced in proportion to the deficit.

Reg. 212
TUBE PLATES


Holding power of plain tubes

a) Where tube plates are not specially stayed in nests of tubes the working pressure, based on the holding power of the tubes shall not exceed that found by the following formula ; -
W.P. = C x D Eqn.(51)
A

Where
D = the diameter of tube at the part of attachment to tube plate in inches,

A = the area in square inches of the tube plate supported by each tube which generally may be taken as the product of the horizontal and vertical pitches of the tube less the area of the tube itself.

C = 470 for tubes expanded into parallel holes in steel or iron tube plates,

C = 530 for tubes expanded into taper holes in steel or iron tube plates.

For copper tube plates or copper or brass tubes the appropriate co-efficient should be deducted 20 percent.

b) In the unstayed tube plates of locotype boilers and in other tube plate in which stay tubes are not required the support afforded by the plain tube shall not be taken to extend beyond the lines enclosing the outer edges of the tubes. Parts of flat plate outside this line shall either lie in the plate margin or be separately supported. No account need be taken of the stiffness of tube plate in the nests of tubes when the above conditions are fulfilled.

Ordinarily the requirements of this clause are applicable only to expanded smoke and water tubes in flat continuous tube plates containing more than one row of tubes

(See Reg. 152 for attachment of tubes in Water Tubes Boilers).
IBR 1950 regulation 580 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 580 page for its amendments.

Reg. 580, Reg. 581

Pitch of tubes

The spacing of tube holes shall be such that the minimum width in inches of any ligament between the tube holes shall be not less than:-

D + ½
8

alternatively,

the thickness and cross-section of the plate between the tube holes shall be not less than

0.125D+0.2=minimum thickness in inches.
0.17D+0.025=minimum cross-section in square inches where D is diameter of the tube holes in inches.

In no case shall the minimum thickness of any tube plate in the tube area be less than the following limits:-

T=1/2 inch, Where the diameter of the tube holes does not exceed 2 inches.
T=9/16 inch, Where the diameter of the tube hole is greater than 2 inches.



Reg. 581

Stay tubes

Stay tubes shall be of steel seamless or electrically resistance welded.
a) Minimum thickness of stay tubes – The minimum thickness of stay tubes shall be as per regulation 148.
b) The maximum working pressure for screwed in stay tube shall be calculated by the following formula:

WP = 5900         1.28
[(D---------------/N )² - D1²]
Equation XII/16
A

D is diameter of the stay tube over threads in inches.
D1 is internal diameter of the tubes under the threads in inches.
N is number of threads per inch.

A is the area in square inches supported by one Stay tube, measured from centre to centre of stay tubes. When the area contains tubes or parts of tubes their aggregate area, calculated from their smallest external diameter of body when in tension and smallest internal diameter when in compression, shall be deducted from the area of the containing figure and the remainder used as A in the formula.

Where stay tubes have their thickness increased at the screwed, ends to provide for plus threads the increased thickness shall be obtained by up-setting and not by welding, and the tubes shall be subsequently annealed.

Stay tubes may be attached to the tube plates either by screwing or by metal arc welding.

Where stay tubes are screwed into the tube plates they shall be screwed with a continuous thread not finer than 11 threads per inch at both ends and shall be expanded into the tube plates, by roller expander and, if desired, may be seal welded.

Welded attachment of stay tubes be as shown in Figure XII/67,XII/67A,XII/68, ,XII/68A and XII/69.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
570
PDF page index
570 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 18b8c5d6985b5d31
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 117, Regulation 117, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.570. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.