Regulation 118. Screw threads of stay tubes
Not yet checked against the official Gazette; verify before relying on it.
118. Screw threads of stay tubes.─(1) Stay tubes shall be screwed at both ends with continuous threads, and the holes in the tube plates shall be tapped with continuous threads. The pitch of the threads shall not be finer than 11 threads per 25 mm. The stay tubes shall be expanded by roller expanders and not made right by caulking only.
(2)Stay tubes may be attached by welding in which case they shall not be adjacent within the same tube nest except in local areas, where not more than two adjacent stay tubes may be attached by welding. The form of attachment shall be such that there is a mechanical hold in addition to the welding, as shown in Fig.3/10. On completion of welding the stay tubes shall be lightly re-expanded.
Fig. 3/10: Typical Example of Welded Stay Tube
Figures cited in this regulation (1, exact crops of the Gazette)

View Gazette page 570 · figure catalogue
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
In short
Regulation 118 sets how stay tubes are threaded, expanded or welded into the tube plates.
Key points
- (1) Stay tubes are screwed at both ends with continuous threads, and the tube plate holes are tapped to match. Threads must not be finer than 11 threads per 25 mm. Stay tubes are expanded by roller expanders.
- (2) Stay tubes may be welded instead. Welded stay tubes must not be adjacent within the same nest, except in local areas where not more than two adjacent ones may be welded. The attachment must give a mechanical hold as well as the weld (Fig. 3/10). After welding, stay tubes are lightly re-expanded.
Watch out
- Stay tubes must not be made tight by caulking only.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
| Historical 1950-edition reg. | Heading as OCR'd | Heading similarity | Source image |
|---|---|---|---|
| 147 | Screw Threads of Stay Tubes | 100% | Chapter III (DPIIT scan), image 7 |
| 581 | Stay tubes | 100% | Chapter XII (DPIIT scan), image 9 |
| 631 | Tubes | 100% | Chapter XV (DPIIT scan), image 3 |
Amendment history of the candidate IBR 1950 regulations: Reg. 581 (3 amendments)
IBR 1950 regulation 147 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 147 page for its amendments.
| Reg. 147 STAY TUBES Screw Threads of Stay Tubes
|
IBR 1950 regulation 581 as last published in the DPIIT web edition (archived 2022)
Unofficial archived copy, not verified; see the regulation 581 page for its amendments.
| Reg. 580, Reg. 581 | |||||||||||||||||
Reg. 581 Stay tubes
| |||||||||||||||||
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.


Indian Boiler Regulations, 2026, reg. 118, Regulation 118, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.570–571. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.