Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 581 — Stay tubes
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulation 580. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 580, Reg. 581 | |||||||||||||||||
Reg. 581 Stay tubes
| |||||||||||||||||
Earlier text: the 2008 DIPP web edition
Stay tubes
Stay tubes shall be of steel seamless or electrically resistance welded. Minimum thickness of stay tubes – The minimum thickness of stay tubes shall be
a)as per regulation 148.
b)The maximum working pressure for screwed in stay tube shall be calculated by the following formula:
5900 1.28
WP = [(D---------------/N )² - Equation XII/16
A D1²]
D is diameter of the stay tube over threads in inches.
D1 is internal diameter of the tubes under the threads in inches.
N is number of threads per inch.
A is the area in square inches supported by one Stay tube, measured from centre to centre of stay tubes. When the area contains tubes or parts of tubes their aggregate area, calculated from their smallest external diameter of body when in tension and smallest internal diameter when in compression, shall be deducted from the area of the containing figure and the remainder used as A in the formula.
Where stay tubes have their thickness increased at the screwed, ends to provide for plus threads the increased thickness shall be obtained by up-setting and not by welding, and the tubes shall be subsequently annealed.
Stay tubes may be attached to the tube plates either by screwing or by metal arc welding.
Where stay tubes are screwed into the tube plates they shall be screwed with a
continuous thread not finer than 11 threads per inch at both ends and shall be expanded into the tube plates, by roller expander and, if desired, may be seal welded.
Welded attachment of stay tubes be as shown in Figure XII/67,XII/67A,XII/68, ,XII/68A and XII/69.
Amendments found
Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.
| Date | Notification | Part | Action | What changed (summary) | Web edition |
|---|---|---|---|---|---|
| 1994-02-07 | G.S.R. 107 OCR of scan | (b), last paragraph | Amended | Changes the figures 'XEI/67' in the last paragraph (operative wording illegible). Uncertain: Operative words garbled ('.hnlI h. ,l..I..,..,I'), probably 'shall be omitted'; figures may be 'XII/67'. | listed before the capture |
| 1996-12-06 | G.S.R. 59 OCR of scan | (b) last paragraph | Substituted | Replaces last paragraph: welded attachment of stay tubes to be as shown in Figures XII/67, XII/67A, XII/68, XII/68A and XII/69. Uncertain: English OCR reads '51'; 581 per Hindi text. | listed before the capture |
| 1996-12-06 | G.S.R. 59 OCR of scan | figures after XII/67 and XII/68 | Inserted | Inserts Figures XII/67A (attachment of plain tubes) and XII/68A (attachment of stay tubes). | listed before the capture |
Possible IBR 2026 successors (heading match, unverified): Reg. 109, Reg. 118, Reg. 119, Reg. 120, Reg. 121, Reg. 400, Reg. 473, Reg. 480