BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 2026 · Chapter 3 · Construction and Workmanship

Regulation 122. Boiler and super heater tubes subject to internal pressure steel tubes

Official text — not yet verifiedGazette 1 Oct 2026 · printed pp. 572–573Table

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

122.Boiler and super heater tubes subject to internal pressure steel tubes.─ (1) All tubes which are subject to internal pressure of water or steam shall be cold drawn or hot finished seamless or electric resistance welded in accordance with Chapter-2. Except as provided for in sub-regulation (2) below, they shall be without joint.

(2)Tubes having an external diameter not exceeding 127 mm may be jointed and such joints may be flash welded, machine forge welded arc or gas welded. Tubes above 127 mm diameter may also be welded provided they are located outside the furnace. Such welds must conform to the requirements of Chapter-7.

(3)Flash butt welding shall be undertaken as per the qualified procedure. The external fin caused by flash butt welding shall be removed subject to a maximum height of 5 percent of the tube outside diameter. The required flow area shall be ensured by conducting ball test using nearest ball diameter of 75% of the nominal Internal Diameter of the tube size.

(4)All fusion welded butt joints shall be post weld heat treated as per the requirements specified in regulation

123.

(5)When gas welding is implied the technique followed shall be approved by a Competent Person.

(6)For design metal temperatures and material requirements refer to Table 2/1 of regulation 30.

(7)The technique employed in all field welding of tubes shall be subject to the approval of Inspecting Authority or Chief Inspector as the case may be.

(8)All butt weld of tubes shall be tested as required hereunder:

(i)For tubes greater than 178 mm bore, all welds shall be non-destructively tested by radiographic or other approved methods.

(ii)For tubes greater than 102 mm bore and up to and including 178 mm bore, ten (10) per cent of the welds by each welder, selected at random with a minimum of 2 welds per welder, shall be subjected to non-destructive examination by radiographic or other approved method.

(iii)For tubes 102 mm bore and under, sample welds simulating the production welds shall be provided for mechanical testing either at a rate of 2 per cent or after each 150 welding hours with a minimum of one sample weld per welder.

(iv)Alternatively, 5 per cent of the welds made by each welder selected at random, with a minimum

(v)of one weld per welder, shall be subjected to non-destructive examination by radiographic or other approved method. This rate may be reduced to 2 per cent by arrangement with the Inspecting Authority after initial satisfactory results have been produced.

In the event of any non-destructive test not meeting the requirements, defects in the welds represented by that test shall be rectified and the Inspecting Authority may call for an increase in the number of non-destructive tests until such time as a satisfactory standard is achieved.

(9)Butt welded joints as indicated in sub-regulation (8) shall be subjected to non-destructive examination by radiographic, radioscopy or other approved methods such as ultrasonic testing including phased array ultrasonic testing, magnetic particle inspection or liquid dye penetrant inspection. When radioscopic examination is to be performed in lieu of radiography on welded components, the following requirements shall be met, namely:-

(a)A written procedure shall be submitted for approval to the Inspecting Authority which shall contain the following:

(i)material and the thickness range;

(ii)equipment qualifications;

(iii)test object scan plan;

(iv)radioscopic parameters;

(v)image processing parameters;

(vi)image display parameters;

(vii)image archiving requirements;

(viii)accept-reject criteria (Code reference);

(ix)performance evaluation;

(x)Operator identification.

(b)The system shall be aided with an image processor to enhance the quality of the radioscopic images and system performance quality shall exhibit-

(i)A thin section contrast sensitivity of 3 percent;

(ii)A thick section contrast sensitivity of 2 percent;

(iii)A spatial resolution of 3 line pairs per mm;

(iv)Image Quality Sensitivity (IQI) sensitivity - 2 percent of the joint thickness when wire IQI's are to be used, the wire diameter axis shall be oriented along the axis of the least sensitivity of the system.

(c)Radioscopes are to be properly marked to co-relate with particular part of joint represented.

(d)The radioscopic examination data shall be recorded and stored on a suitable storage media like videotape, magnetic disk or optical disk at the maker's plant for a sufficient period after the date of radioscopic examination as specified by the Inspecting Authority, efficient radioscopic examination record recall shall be made available at any time over the record retention period and shall be traceable to the test objects.

(e)When repair has been performed as a result of radioscopic examination, the repaired areas shall be re-examined using the same radioscopic technique to evaluate the effectiveness of the repair.

(f)To aid in proper interpretation of the radioscopic examination data, the details of the technique used shall accompany the data. The minimum information shall include the approved procedure requirements and system performance test data.

Tables and formulae are shown in their extracted layout. Alignment, superscripts and subscripts may be lost. The Gazette page image is authoritative.

Referenced provisions

Reg. 30 · Reg. 123

Independent explanation — not the law · draft · engineer review in progress

In short

Regulation 122 covers steel boiler and superheater tubes under internal pressure: how they are made, when they may be jointed by welding, heat treatment, and how butt welds are tested, including the rules for radioscopy.

Key points

  • (1) Tubes must be cold drawn or hot finished seamless, or electric resistance welded, as per Chapter 2. They must be without joint except as allowed in (2).
  • (2) Tubes of external diameter not exceeding 127 mm may be jointed by flash, machine forge, arc or gas welding. Tubes above 127 mm may be welded only if located outside the furnace. Welds must meet Chapter 7.
  • (3) Flash butt welding follows a qualified procedure. The external fin is removed subject to a maximum height of 5 percent of tube OD, and flow area is checked by a ball test using the nearest ball diameter of 75% of the nominal internal diameter.
  • (4) Fusion welded butt joints are post weld heat treated as per regulation 123.
  • (5) Gas welding technique needs approval by a Competent Person; (7) field welding technique needs approval of the Inspecting Authority or Chief Inspector, as the case may be.
  • (6) Design metal temperatures and materials: see Table 2/1 of regulation 30.
  • (8) Testing of butt welds depends on bore: over 178 mm, all welds by NDT; over 102 mm up to 178 mm, ten per cent of each welder's welds (minimum 2 per welder) by NDT; 102 mm and under, sample welds for mechanical testing at 2 per cent or after each 150 welding hours, or alternatively 5 per cent NDT (reducible to 2 per cent by arrangement with the Inspecting Authority after satisfactory initial results).
  • (9) Allowed NDT methods include radiography, radioscopy, ultrasonic (including phased array), magnetic particle and dye penetrant. They are not interchangeable: surface methods (magnetic particle, dye penetrant) do not replace volumetric examination where that is required. Radioscopy in place of radiography needs an approved written procedure, an image processor, set system performance (3 percent thin-section and 2 percent thick-section contrast sensitivity, 3 line pairs per mm resolution), marked images, stored records, re-examination of repairs and technique details with the data.

Watch out

  • If any NDT fails, the defects must be rectified and the Inspecting Authority may increase the number of tests until a satisfactory standard is reached.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

Historical 1950-edition reg.Heading as OCR'dHeading similaritySource image
631Tubes100%Chapter XV (DPIIT scan), image 3
567Dished ends subject to internal pressure82%Chapter XII (DPIIT scan), image 4
IBR 1950 regulation 567 as last published in the DPIIT web edition (archived 2022)

Unofficial archived copy, not verified; see the regulation 567 page for its amendments.

Reg. 567, Reg. 567A

Dished ends subject to internal pressure

a)

For unstayed ends of shells and tops of vertical boilers and the like boiler parts, when dished to partial spherical form the maximum working pressure shall be determined by the following formula:-

WP = 15 x S X (t-1)
Equation XII/7
R

WP is the working pressure in pounds per square inch.

t is thickness of the end plate in thirty seconds of an inch but in no case this shall be less than the thickness of the shell to which it is attached.

R is the inner radius of curvture of the end in inches, which shall not exceed the external diameter of the shell to which it is attached.

S is the minimum tensile breaking strength of plate in tons per square inch, or whatever is allowed for it.
b) The inside radius to which a crown plate is dished shall be not greater than the external diameter of the cylinder to which it is attached.
c) The inside radius of curvature of the flanges to the shell shall be not less than 4 times the thickness of the crown plate and in no case less than 2 ½ inches.
d) The inside radius of curvature of flanges to uptakes shall be not less than twice the thickness of the crown plate and in no case less than 1 inch.
e) When the end has a manhole in it (t-5), shall be substituted for (t -1) in the formula.
f) The total depth of flange of manhole from the outer surface in inches measured on the minor axis shall be at least equal to-

ÖT X W depth of flange in inches Equation XII/8

where T is the thickness of the plate in inches and W is the minor axis of the hole in inches.
g) The depth of the crown plate opening from the commencement of the curvature of the flanging radius shall be not less than twice the plate thickness with a minimum of one inch.


Reg. 567A

Nothing in Regulation 567 shall preclude the use of dished ends in compliance with Regulations 275 to 278, where not fitted with an uptake.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
572–573
PDF page index
572–573 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash ec46c773170f5fd3
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 122, Regulation 122, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.572–573. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.