Indian Boiler Regulations, 2026 · Chapter 3 · Construction and Workmanship

Regulation 139. Positions of manhole in shell

Official text — not yet verifiedGazette 1 Oct 2026 · printed p. 585

Not yet checked against the official Gazette; verify before relying on it.

Reproduced from the Gazette of India · verification status above

139. Positions of manhole in shell.─ Manholes and other openings in cylindrical shells shall be placed as far as possible from the seams, preferably towards the back end to the boiler top. Wherever practical, oval openings shall be arranged with the minor axis parallel to the longitudinal centre line of the boiler. In no case shall the circumferential length of any opening exceed twice the longitudinal width of the opening.

Independent explanation — not the law · draft · engineer review in progress

In short

Manholes and other openings in cylindrical shells must be placed as far as possible from seams, preferably towards the back end of the boiler top. Where practical, oval openings have their minor axis parallel to the boiler's longitudinal centre line.

Watch out

  • The circumferential length of any opening must never exceed twice its longitudinal width.

Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.

Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).

Orientation hints (unverified)

These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.

No candidate heading found in the historical print edition.

Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Instrument
Indian Boiler Regulations, 2026 (made by the Central Boilers Board under s.40 of the Boilers Act, 2025)
Notification
F.No. P-30014/3/2021-Boiler dated 7 Aug 2026
Published
Gazette of India, Extraordinary, Part III Sec. 4, No. 596, 1 Oct 2026 (CG-DL-E-06102026-276813)
In force
1 Oct 2026 (reg. 1(3): date of publication in the Official Gazette)
Printed Gazette page
585
PDF page index
585 · open official e-Gazette PDF
Extraction
pdftotext layout mode, sequential regulation detector · text hash 9c2120f363ba66bc
Verification
Official text — not yet verified
Amendments checked
None known after 1 Oct 2026 as of build date (not a guarantee). Amendment log
How to cite

Indian Boiler Regulations, 2026, reg. 139, Regulation 139, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.585. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).

The citation refers to the government publication. Cite the Gazette, not this website.

Help improve this page

Engineers like you keep IBRsource accurate. Every checked correction or tip helps the next reader.